Laserfiche WebLink
Page 2 <br />Newmont Mining Corpora�on Cripple Creek & Victor Gold Mine 2024 CQA VLF2 P3 Stage B NewFields Job No. 475.0106.069 Week Ending Friday, March 15, 2024 <br />1.0 CC&V AND CONTRACTOR OPERATIONS <br /> Earthworks <br />1.1.1 Dump 1/Stage B Cut Sloping <br />Holcim began to slope to grade on the exis�ng Dump 1 area. Overburden material was pushed <br />down a placed into stockpiles by three to four dozers. <br />CC&V Opera�ons began to haul away overburden from the Stage B project limits. Overburden <br />material was loaded into haul trucks and hauled to the ac�ve area of VLF2 Phase 2/3 and <br />placed. <br />Figure 1 provides the loca�on of the approximate push area and load out area. <br />1.1.2 Leak Detec�on Trenches <br />No work during the week. <br /> Laboratory Tes�ng None. <br />2.0 MEETINGS AND COMMUNICATIONS <br />NewFields personnel met with Holcim (Tim Provost) daily to discuss project progress, and <br />specifica�ons. <br />NewFields personnel met with CC&V Opera�ons and Technical Services daily to discuss <br />overburden material removal. <br />NewFields personnel met with Evan Fonger, Daniel Egley, and Antonio Matarese (CC&V <br />Projects) daily to discuss safety and project progress. <br />3.0 MISCELLANEOUS, ISSUES, AND CONCERNS None.