My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (13)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:39:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
09 Appendix E
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation Cripple Creek & Victor Gold Mine 2024 CQA VLF2 P3 Stage B NewFields Job No. 475.0106.069 Week Ending Friday, March 29, 2024 <br /> <br />Page 2 <br /> <br />1.0 CC&V AND CONTRACTOR OPERATIONS <br /> Earthworks <br />1.1.1 Dump 1/Stage B Cut Sloping <br />Holcim continued to slope to grade on the existing Dump 1 area. Overburden material was <br />pushed down a placed into stockpiles by three to four dozers. <br />CC&V Operations continued to haul away overburden from the Stage B project limits. <br />Overburden material was loaded into haul trucks and hauled to the active area of VLF2 Phase 2/3 <br />and placed. <br />Figure 1 provides the location of the approximate push and load out area. <br />1.1.2 Leak Detection Trenches <br />No work during the week. <br /> Laboratory Testing <br />None. <br />2.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel met with Holcim (Tim Provost) daily to discuss project progress, and <br />specifications. <br /> NewFields personnel met with CC&V Operations and Technical Services daily to discuss <br />overburden material removal and owner performed structural fill specifications. <br /> NewFields personnel met with Evan Fonger, Daniel Egley, and Antonio Matarese (CC&V <br />Projects) daily to discuss safety and project progress. <br />3.0 MISCELLANEOUS, ISSUES, AND CONCERNS <br />None.
The URL can be used to link to this page
Your browser does not support the video tag.