Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02271 RIPRAP  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 02271 Riprap    Page 2  <br />C. Rip rap shall conform to the gradation requirements given in the following table:  <br />Stone Size  d50 (in)1 Percent of Material Smaller than  <br />Typical Stone2,4  <br />Typical Stone Dimensions3   <br />(in)  <br />6 70 – 100 12  <br />50 – 70 9  <br />35 – 50 6  <br />2 – 10 2  <br />15 70 – 100 26  <br />50 – 70 21  <br />35 – 50 15  <br />2 – 10 5  <br />1  d50 = average stone size  <br />2  Based on typical rock weight  <br />3  Equivalent spherical diameter  <br />4  Based on a specific gravity of 2.5  <br />  <br />D. Nominal stone size and total thickness of the riprap shall be as shown on the DRAWINGS.  <br />2.2. Installation  <br />Stones with typical stone dimensions that are equal to d50 and larger shall be placed at the top  <br />surface with faces and shapes matched to minimize voids and form as smooth a surface as  <br />practical. Dumping and backhoe placement alone is not sufficient to ensure a properly interlocked  <br />system. The material may be machine‐ placed to form a substantial bond as approved by  <br />MANAGER and CERTIFYING ENGINEER.  <br />