My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-27_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-01-27_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:09:23 PM
Creation date
1/28/2025 11:37:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
1/27/2025
Doc Name Note
07 Appendix C
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR146
Email Name
ERR
ZTT
LJW
BEH
JPL
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02200-1 EARTHWORKS – Owner Performed Work <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />September 13, 2023 <br /> <br /> <br /> <br />Technical Specification No.02200-1 Earthworks – Owner Performed Work Page 7 <br />capable of allowing the movement of vehicles and equipment over the surface <br />without causing rutting or other deleterious effects. <br />3. CONTRACTOR shall place Structural Fill materials with less than 30 percent rock <br />materials above 3/4-inch size in maximum 12-inch loose lifts, and compact to 95 <br />percent of maximum dry density (ASTM D698). The moisture content shall be within <br />+3% to -3% of the optimum moisture content. <br />4. CONTRACTOR shall condition, place and compact Structural Fill containing more than <br />30 percent rock materials above 3/4-inch size (rock fill) by a method compaction <br />technique. The compaction equipment shall consist of a minimum 10-ton (static drum <br />weight) vibratory smooth-drum compactor. The number of passes and loose lift <br />thickness shall be subject to CERTIFYING ENGINEER's approval, at no additional cost <br />to CC&V. The method specifications may be changed at any time, at the discretion of <br />CERTIFYING ENGINEER, based upon changes in material characteristics, field <br />conditions, and/or compaction equipment. <br />5. Maximum rock size for rock fill shall be two-thirds of the compacted lift thickness, <br />unless otherwise approved by MANAGER, DESIGN ENGINEER, and CERTIFYING <br />ENGINEER. CONTRACTOR shall remove oversize materials from fills at no additional <br />cost to CC&V. <br />3.4. Equipment <br />CONTRACTOR may use any type of earthmoving or excavating equipment unless otherwise noted <br />in the SPECIFICATIONS, provided the equipment is in a satisfactory condition, complies with <br />applicable rules and regulations, is of such capacity that the construction schedule can be <br />maintained as planned by CONTRACTOR, and is approved by MANAGER. <br />
The URL can be used to link to this page
Your browser does not support the video tag.