Laserfiche WebLink
Newmont-Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02200-1 EARTHWORKS – Owner Performed Work <br />VLF2 Phase 3 <br />Project No.475.0106.049 <br />September 13, 2023 <br /> <br /> <br /> <br />Technical Specification No.02200-1 Earthworks – Owner Performed Work Page 2 <br />2. PART 2: PRODUCTS <br />2.1. Materials <br />A. Fill materials will be soils, gravels, or rock fill approved by MANAGER and CERTIFYING <br />ENGINEER. The materials shall be free of organic matter, debris, frozen material, and <br />other deleterious materials, and shall be excavated, as required, as follows: <br />1. Overburden Fill – material as approved by the Manager and Certifying Engineer <br />conforming to the following specifications: <br />U.S. Standard <br />Sieve Size <br />Percent Passing <br />by Dry Weight <br />60– inch 100 <br />36-inch 80-100 <br />3-inch 40 -100 <br /> <br />2. Structural Fill - material as approved by MANAGER and CERTIFYING ENGINEER <br />conforming to the following specification: <br />U.S. Standard <br />Sieve Size <br />Percent Passing <br />by Dry Weight <br />24 – inch 100 <br />8-inch 40-100 <br />No. 200 0 – 25 <br />Plasticity Index: 30 maximum <br /> <br /> <br />