Laserfiche WebLink
CLIENT  <br />Newmont ‐ Cripple Creek &   <br />Victor Gold Mine  <br />PROJECT NO  <br />475.0106.049  <br />PROJECT: VLF2 Phase 3  <br />TITLE: TECHNICAL SPECIFICATIONS  SPECIFICATION NO.  <br />TABLE OF CONTENTS  <br />Table of Contents Page 1  <br />TABLE OF CONTENTS <br />Specification Name Specification Number Revision Date  <br />Construction Staking 1050 8/27/2021  <br />Earthworks Construction Quality Assurance  <br />(CQA) Plan  <br />1400 8/27/2021  <br />Earthworks Construction Quality Assurance  <br />(CQA) Plan – Owner Performed Work  <br />01400‐1 9/13/2023  <br />Geosynthetics Construction Quality  <br />Assurance (CQA) Plan  <br />01400‐2 8/27/2021  <br />Earthworks 2200 8/27/2021  <br />Earthworks – Owner Performed Work 02200‐1 9/13/2023  <br />Underground Working Remediation 2210 8/27/2021  <br />RipRap 2271 8/27/2021  <br />Pipe Bollards 2608 8/27/2021  <br />Piping 2710 8/27/2021  <br />Geomembrane 02776‐0 1/11/2022  <br />Geogrid 02776‐1 8/27/2021  <br />Geotextile 2777 8/27/2021  <br />Cast‐in‐Place Concrete 3300 8/27/2021  <br />Cemented Rockfill 3310 8/27/2021  <br />Concrete Plug 3320 8/27/2021  <br />Flowable Fill 3330 8/27/2021