Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400 EARTHWORK CQA  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 01400 Earthwork CQA    Page 9  <br />7.6. Construction Certification Report  <br />At the completion of the project, the CQA MONITOR shall submit to MANAGER a Construction  <br />Certification Report. This report shall certify that the work has been performed in compliance  <br />with the DRAWINGS and SPECIFICATIONS and will contain the following information:  <br /> summary of all construction activities;  <br /> photographic documentation;  <br /> test data sheets;  <br /> copies of weekly reports;  <br /> CQA test results, including date, test locations and resolutions of deficient test results;  <br /> copies of surveyors certificate;  <br /> fill temperature monitoring results;  <br /> staff schedule summary;  <br /> a description of significant construction problems and the resolution of these problems;  <br /> changes to the DRAWINGS or SPECIFICATIONS and the justification for these changes;  <br /> record drawings, and   <br /> a statement certifying that construction was completed in compliance with the DRAWINGS  <br />and SPECIFICATIONS, signed, and sealed by the CERTIFYING ENGINEER registered in the State  <br />of Colorado.