Laserfiche WebLink
Table 2Cripple Creek & Victor Gold Mining CompanyValley Leach Facility 2 Phase 3Stage B Subgrade and Leak Detection Record of ConstructionEarthworks Testing Summary and FrequencyStructural Fill (HCBF)Structural Fill (SF)Leak Detection Fill (LDF)Quantity of Material Placed (cy) 15,256 94,520 137Particle Size Tests Performed 1 2 2Specified Particle Size Test Frequency 50,000 50,000 10,000Actual Particle Size Test Frequency 15,256 47,260 69Atterberg Limit Tests Performed 1 2 2Specified Atterberg Limit Test Frequency 50,000 50,000 10,000Actual Atterberg Limit Test Frequency 15,256 45,762 69Laboratory Compaction Tests Performed See Note 1 See Note 1 N/ASpecified Compaction Test Frequency N/A N/AActual Compaction Test Frequency N/A N/APermeability Tests Performed N/A N/A N/ASpecified Permeability Test FrequencyActual Permeability Test FrequencyMoisture Content Tests Performed See Note 1 See Note 1 N/ASpecified Moisture Content Test Frequency 2,000 2,000Actual Moisture Content Test Frequency See Note 1 See Note 1Field Nuclear Density Tests Performed See Note 1 See Note 1 N/ASpecified Nuclear Density Test Frequency 2,000 2,000Actual Nuclear Density Test Frequency See Note 1 See Note 1Field Depth Verification Tests Performed N/A N/A N/ASpecified Depth Verification Test FrequencyActual Depth Verification Test FrequencyNotes:2. All frequencies are based on quantities in cubic yards unless stated otherwise.3. N/A = Not Applicable1. The method of compaction technique was used in accordance with the project technical specifications Material QuantityNumber of TestsTest FrequencyN/AN/AN/AN/A N/AN/AN/AN/AN/AMaterialPage 1 of 1