<br />P:\Projects\0106.069 CC&V 2024 CQA\J-REPORTS\2024 Phase 3B Subgrade and Leak Detection ROC Report <br /> Page 6 <br />the VLF2 Phase 3 Stage B ROC Drawings was performed by Foresight West Survey. A <br />copy of the Surveyor’s Professional License is presented in Appendix B. The Technical <br />Specifications are presented in Appendix C and the earthwork material specifications are <br />summarized in Table 1. Any deviations from the IFC drawings or project Technical Specifications <br />are discussed in Section 4 of this report. <br />1.4. Use of this Report <br />This report has been prepared exclusively for Cripple Creek & Victor Gold Mining Company. No <br />third party shall be entitled to rely on any information, conclusions, opinions, or other <br />information contained herein without the express written consent of CC&V. Any third party that <br />does rely on any information, conclusions, opinions, or other information contained herein <br />without the express written consent of CC&V understands and acknowledges that NewFields is <br />not liable for any claim arising out of such use. <br />2. VLF2 PHASE 3 CONSTRUCTION ACTIVITIES <br />CC&V Operations Performed construction activities during the VLF2 Stage B Subgrade and Leak <br />Detection project. Equipment used to perform these activities is listed below: <br /> CAT 793 Haul Trucks <br /> CAT 994 Loader (GPS) <br /> Letourneau Loader (GPS) <br /> CAT D10 Dozer (GPS) <br />Holcim performed construction activities during the VLF2 Stage B Subgrade and Leak Detection <br />project. Equipment used to perform these activities is listed below: <br /> CAT 14 Motor-grader <br /> CAT D6 LGP Dozers (GPS) <br /> CAT D8 Dozer (GPS) <br /> CAT D9 Dozer (GPS) <br /> CAT D10 Dozers (GPS) <br /> CAT 966 Loader <br /> CAT CS56 Sheepsfoot Compactor <br /> John Deere 470 Excavator (GPS) <br /> CAT 730 Haul Trucks <br /> CAT 740 Water Wagon <br /> CAT 320 Excavator (GPS) <br /> <br />2.1. Clearing and Grubbing <br />The footprint of VLF2 Phase 3 Stage B is located on an existing Overburden Storage Facility and <br />existing mining operations haulage roads. No clearing and grubbing was necessary for the <br />project.