Laserfiche WebLink
<br />P:\Projects\0106.069 CC&V 2024 CQA\J-REPORTS\2024 Phase 3B Subgrade and Leak Detection ROC Report <br /> Page 2 <br /> A300 STAGE C GRADING PLAN <br /> A308 STAGE C LOW COMPACTION ZONE <br /> A310 STAGE C ISOPACH <br /> A320 STAGE C HIGH VOLUME SOLUTION COLLECTION SYSTEM PIPING PLAN <br /> A340 STAGE C LEAK DETECTION PLAN & PROFILE (1 OF 2) <br /> A341 STAGE C LEAK DETECTION PLAN AND PROFILE (2 OF 2) <br /> A342 STAGE C LEAK DETECTION ALIGNMENT TABLES <br /> A360 STAGE C BENCH ALIGNMENT & ALIGNMENT TABLE <br /> A370 STAGE C PERIMETER ACCESS ROAD PLAN & PROFILE (1 OF 2) <br /> A371 STAGE C PERIMETER ACCESS ROAD PLAN & PROFILE (2 OF 2) <br /> A420 LEAK DETECTION DETAILS (1 OF 2) <br /> A421 LEAK DETECTION DETAILS (2 OF 2) <br /> A430 VALLEY LEACH FACILITY SECTIONS & DETAILS (1 OF 3) <br /> A431 VALLEY LEACH FACILITY SECTIONS & DETAILS (2 OF 3) <br /> A432 VALLEY LEACH FACILITY SECTIONS & DETAILS (3 OF 3) <br /> A460 HIGH VOLUME SOLUTION COLLECTION SYSTEM DETAILS <br /> A470 UNDERGROUND WORKING REMEDIATION TYPICAL DETAILS <br /> <br />RECORD OF CONSTRUCTION DRAWINGS <br /> RECORD DRAWING NO. 1 OF 3 GENERAL COMPOSITE OVERVIEW <br /> RECORD DRAWING NO. 2 OF 3 LEAK DETECTION TRENCH 1B AS-BUILT <br /> RECORD DRAWING NO. 3 OF 3 LEAK DETECTION TRENCH 2B AS-BUILT <br />