Laserfiche WebLink
COLORADO <br /> Division of Reclamation, <br /> Mining and Safety <br /> Department of Natural Resources <br /> MINING AND RECLAMATION PERMIT <br /> MUNICIPALITY/LOCAL GOVT AGENCY/ASSN CONSTRUCTION MATERIAL MINING <br /> OPERATIONS <br /> Permit Number: M-2024-015 <br /> Type of Permit: 112c <br /> Permit Date: January 17,2025 <br /> (Anniversary date for annual report and fees purposes) <br /> THIS PERMIT is issued by the Mined Land Reclamation Board,Department of Natural Resources, State <br /> of Colorado. <br /> RECITALS <br /> A. The Permittee,Central Colorado Water Conservancy District,desires to conduct a mining operation <br /> known as Sweet Valley Pit,for the purpose of extracting Sand and gravel. Unless this pen-nit is <br /> modified or a separate pen-nit is issued to cover the mining and/or recovery of other minerals or <br /> extractive products,the Permittee will not mine or recover any other commodities at this site. <br /> B. On December 11,2024 the Mined Land Reclamation Board(Board)approved the Permittee's <br /> application for this permit, and directed that this permit be issued upon the filing with the Division of <br /> Reclamation,Mining and Safety(Division)of performance warranty approved by the Division. Said <br /> warranty has been filed with the Division. <br /> C. If the Permittee desires to extract materials other than those listed in(A),a separate permit or a permit <br /> modification may be required. <br /> D. On December 11,2024 the Board made the following findings: <br /> 1. The application for this pen-nit complies with the requirements of the Colorado Mined Land <br /> Reclamation Act for the Extraction of Construction Materials,C.R.S. 34 32.5 101 et seq.,as <br /> amended,and with all applicable local,state and federal laws; <br /> 2. The operation will not adversely affect the stability of any significant,valuable,and permanent <br /> man made structure located within two hundred feet of the Affected Land,except where there is <br /> an agreement between the Operator and the persons having an interest in the structure that <br /> damage to the structure is to be compensated for by the Permittee or if such an agreement cannot <br /> be reached,an engineering analysis establishes no damage will occur to the structure to the <br /> satisfaction of the Division;and; <br /> 3. The proposed mining and reclamation operations can be carried out in conformance with the <br /> requirements of the Act,and the Construction Material Rules and Regulations. <br /> [I] <br />