My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-07_PERMIT FILE - C1996083 (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2025-01-07_PERMIT FILE - C1996083 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2025 11:03:38 AM
Creation date
1/24/2025 10:55:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
1/7/2025
Doc Name
Pages 2.05-1 to 2.05-83
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Abandonment <br />DRMS Bond <br />Drill Holes <br />DMRS <br />Diameter/ <br />Depth <br />Report <br />Hole ID <br />AKA <br />Release Status <br />Released <br />Insp Date <br />Surface <br />Depth <br />Sealed <br />Pad Area <br />Road Area Map O9 Identifier Permitting Action <br />For Drill Pad <br />Casing <br />Acres <br />Acres <br />10 <br />N/A <br />N/A <br />6 <br />50 <br />0 <br />0 <br />DELETED TR -96 <br />11 <br />N/A <br />N/A <br />6 <br />50 <br />0 <br />0 <br />DELETED TR -96 <br />0 <br />0 <br />MR92 <br />Yes <br />GVB-BA-A <br />Phase I, II <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />7/9.625 <br />560 <br />194 <br />0 <br />0 <br />190 <br />GVB <br />0 <br />0 <br />MR1DO <br />Yes <br />GVB-BA-B <br />Phase I, II <br />Phase I, ll, III <br />Aug. 4-6, 2015 <br />7/9.625 <br />960 <br />825 <br />0 <br />0 <br />191 <br />0.5 <br />MR104 <br />N/A <br />GVB 9B <br />N/A <br />N/A <br />Hole not drilled and not permitted <br />Relocation only, no sea <br />1 <br />0 <br />MR105 <br />Yes <br />GVB-8-TG <br />Phase 1, 11 <br />Yes <br />Aug. 4-6,2015 <br />9.6251 <br />732 <br />730 <br />1 <br />0 <br />194 <br />Changes/additions to GVB <br />0 <br />IMR106 <br />Added holes under TR -52 and MR -104 <br />N/A <br />GVB-10B <br />N/A <br />N/A <br />9.375 <br />1570 <br />Hole not drilled and not permitted <br />193 <br />N/A <br />GVB-10D-2 <br />GVB-10C <br />Phase I, 11 <br />Yes <br />Aug. 4-6, 2015 <br />9.625/14 <br />1760 <br />177 <br />Accounted for in TR -52 <br />N/A <br />GVB-10U-1 <br />Phase I, II <br />Yes <br />Aug. 4-6, 2015 <br />9.375 <br />1650 <br />180 <br />Accounted for in TR -52 <br />N/A <br />GVB-10U-2 <br />N/A <br />N/A <br />9.375 <br />1650 <br />Hole not drilled and not permitted <br />177 <br />3 geotechnical holes <br />180 <br />0 <br />0 <br />MR115 <br />Yes <br />TC-GEO 1 <br />N/A <br />Phase 1, ll, 111 <br />Aug. 4-6, 2015 <br />2 <br />60 <br />60 <br />0 <br />0 <br />196 <br />Yes <br />TC-GEO 2 <br />N/A <br />Phase 1, ll, 111 <br />Aug. 4-6, 2015 <br />2 <br />60 <br />60 <br />0 <br />0 <br />196 <br />Yes <br />TC-GEO 3 <br />N/A <br />Phase I, 11, 111 <br />Aug. 4-6, 2015 <br />2 <br />60 <br />60 <br />0 <br />0 <br />196 <br />Terror Creek Access <br />6 <br />MR116 <br />Access road no drilling <br />Terror Creek geotechnical <br />N/A <br />Yes <br />I <br />MR119 <br />Move geotech holes <br />6 GVBs <br />5315 <br />6.20 <br />1.60 <br />MR123 <br />Yes <br />GVB-B11A <br />Phasel <br />Yes <br />Aug. 4-6,2015 <br />7/9.625/14 <br />768 <br />172 <br />1 <br />0 <br />209 <br />Yes <br />GVB-B11B & Road <br />Phasel <br />Yes <br />Aug. 4-6,2015 <br />7/9.625/14 <br />740 <br />274 <br />1.1 <br />0 <br />210 <br />Yes <br />GVB-B12A <br />Phasel <br />Yes <br />Aug. 4-6,2015 <br />7/9.625/14 <br />1056 <br />600 <br />1 <br />1.3 <br />211 <br />Yes <br />GVB-B12B & Road <br />Phasel <br />Yes <br />Aug. 4-6,2015 <br />7/9.625/141 <br />855 <br />126 <br />1.1 <br />0 <br />212 <br />Yes <br />GVB-B12C <br />Phasel <br />Yes <br />Aug. 4-6,2015 <br />7/9.625/14 <br />865 <br />422 <br />1 <br />0 <br />213 <br />Yes <br />GVB-B13A <br />Phasel <br />Yes <br />Aug. 4-6,2015 <br />7/9.625/14 <br />1031 <br />6S51 <br />1 <br />0.3 <br />214 <br />2 GVBs <br />1 2.00 <br />0.40 <br />MR124 <br />Yes <br />GVB-B11C <br />Phasel <br />Yes <br />Aug. 4-6, 2015 <br />7/9.625/14 <br />755 <br />158 <br />1 <br />0 <br />218 Revised MR -123 Hole I <br />Yes <br />GVB-B12D <br />Phasel <br />Yes <br />Aug. 4-6,2015 <br />7/9.625/14 <br />1061 <br />35 <br />1 <br />0.4 <br />219 <br />0.5 <br />Yes <br />DH -2010-2 <br />Phase I, II <br />Yes <br />Aug. 4-6, 2015 <br />9.675 <br />2270 <br />0.51 <br />0 <br />204 <br />Bowie #1 Mine MR -12, <br />1362 <br />2.00 <br />1.10 <br />MR125 <br />Yes <br />GVB-10A <br />GVB-B10A <br />Phase I, II <br />Yes <br />Aug. 4-6, 2015 <br />9.625/7/14 <br />757 <br />500 <br />1 <br />0.4 <br />205,207 Bowie #1 Mine MR -12! <br />Yes <br />GVB-10B <br />GVB-B10B <br />Phasel <br />Yes <br />Aug. 4-6, 2015 <br />9.625/7/14 <br />605 <br />386 <br />1 <br />0.7 <br />206,208 <br />1787 <br />1.00 <br />0.23 <br />MR -127 -Bowie No. 1 IN <br />Yes <br />2011-2 <br />Phase I, II <br />Yes <br />Aug. 4-6, 2015 <br />6/9.75 <br />1787 <br />1787 <br />1.0 <br />0.23 <br />012,015 <br />4 utility holes, one GVB <br />1 <br />1.00 <br />0.30 <br />MR133 <br />Utility holes <br />N/A <br />No <br />101 <br />520 <br />01 <br />0 <br />242 <br />Utility holes <br />N/A <br />No <br />10 <br />5201 <br />01 <br />0 <br />242 <br />Utility holes I <br />N/A <br />No <br />101 <br />5201 <br />01 <br />0 <br />242 <br />Utility holes I <br />N/A <br />No <br />101 <br />5201 <br />01 <br />0 <br />242 <br />MR -192 2.05-45iv 02/17 <br />ling task <br />n MR <br />lepths <br />line <br />
The URL can be used to link to this page
Your browser does not support the video tag.