Laserfiche WebLink
2.05.3 <br />(3)(b) A description of each existing structure. <br />There are no existing structures within the permit area which the applicant <br />intends to utilize for the mining operation. <br />(3)(c) A description of each road conveyor, or rail system to be constructed or used within <br />the permit area. <br />Conveyors <br />There are twenty-one separate conveyors constructed on the property which <br />are described as follows: <br />1 & 2. Portal Conveyors <br />The portal conveyors are extensions of the conveyor from within the D -Seam <br />and B -Seam. Approximately 140 -feet of this 72 -inch wide conveyor extends <br />from both portals to the respective portal transfer buildings. <br />3. Gob Belt <br />The gob belt conveys gob from the D- Bench portal transfer building to the <br />temporary gob pile. This 48 -inch wide conveyor is approximately 81 -feet <br />long. <br />4. Stockpile Conveyor <br />The stockpile conveyor transfers coal from the portal transfer tower to the <br />stacking tube and coal stockpile. This 72 -inch wide conveyor is <br />approximately 393 -feet long. There is a 16 foot by 20 foot by 20 foot high <br />structure located over the stockpile conveyor which suspends a magnet over <br />the stockpile conveyor belt. <br />5. Off -Specification Coal Conveyor <br />The off -spec conveyor transfers low quality coal from the top of the stacking <br />tube to the south east edge of the run -of -mine coal pile. This 72 -inch wide <br />conveyor is approximately 111 -feet long. <br />6. Reclaim Conveyor <br />The reclaim conveyor transfers coal from the coal stockpile to the screen and <br />crusher building. This 48 -inch wide conveyor is approximately 402 -feet long. <br />PR -12 2.05-22- 02/10 <br />A HkOV6b <br />I) �l--//O <br />