My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-23_HYDROLOGY - M1983176
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1983176
>
2025-01-23_HYDROLOGY - M1983176
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2025 11:23:32 AM
Creation date
1/24/2025 7:39:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983176
IBM Index Class Name
Hydrology
Doc Date
1/23/2025
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
NCG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 Speer Mining Resources SWSP Page 7 of 9 <br /> January 23, 2025 <br /> In addition, the Applicant shall verify that the entities making replacements are <br /> identifying this use on their accounting submitted to our office. For the period of this <br /> plan, that entity is the City of Aurora (WDID 0802593 - Aurora Reuse). <br /> 10.The name, mailing address, and phone number of the contact person who will be <br /> responsible for operation and accounting of this plan must be provided on the <br /> accounting forms to the Division Engineer and Water Commissioner. <br /> 11.Approval of this SWSP does not relieve the Applicant and/or landowner of the <br /> requirement to backfill the site, line the site, or obtain a Water Court decree <br /> approving a permanent plan for augmentation to ensure the permanent <br /> replacement of all depletions, including long-term evaporation losses and lagged <br /> depletions after gravel mining operations have ceased. Due to the current <br /> litigation, the deadline to file an application for a plan for augmentation with the <br /> Water Court or show progress in backfilling or lining the pond is extended to <br /> December 31, 2025. Approval of this plan does not imply approval by this office of <br /> any related litigation. By that date, the Applicant or its successor in ownership <br /> must have either filed an application with the Water Court for a court-approved <br /> augmentation plan, commenced backfilling, or commenced lining of the site. <br /> 12. If reclamation of the mine site will produce a permanent water surface exposing <br /> groundwater to evaporation, an application for a plan for augmentation must be filed <br /> with the Division 1 Water Court to include, but not be limited to, long-term <br /> evaporation losses and lagged depletions. If a lined pond results after reclamation, <br /> replacement of lagged depletions shall continue until there is no longer an effect on <br /> stream flow. Granting of this plan does not imply approval by this office of any such <br /> court application(s). Any future SWSP request must specify the work done towards <br /> backfilling or lining the site and identify the future plans to eliminate evaporative <br /> depletions, such as continued backfilling or lining of the site. <br /> 13.The Applicant shall follow the accounting protocol as referenced in the attached <br /> document for the operation of this SWSP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.