Laserfiche WebLink
-4- <br /> 12. Primary future(Post-mining)land use(check one): <br /> LJ Cropland(CR) D Pastureland(PL) 1:1General Agriculture(GA) <br /> 171 Rangeland(RL) _0 Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) ' 1 Recreation(RC) Industrial/Commercial(IC) <br /> nDeveloped Water Resources(WR) j1 Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one : <br /> 11 Cropland(CR) �""� Pastureland(PL) General Agriculture(GA) <br /> 1 1 Rangeland(RL) L-I Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) El Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Material will be extracted using front end loaders. <br /> 15. On Site Processing: I✓I Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Excavation will be performed by front end loaders which will remove and haul the raw resource to a processing plant and will deposit the matenal in a surge pile A front end loader will deposit the material <br /> from the surge pile into the crushing and screening plant <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> No designated chemicals or acid-producing materials will be used or stored within the permit area. <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> This application is requesting a conversion from a Special 111Operation to a Construction <br /> Material Regular 112 Operation. No other changes to the permit or operations are requested. <br />