Laserfiche WebLink
Huerfano County Monthly Climate Averages <br /> ,o)12 Month Climate Scroll+ ? 'F O'C <br /> Month July August September October November Decerr <br /> Avg.Temperatures Hi 79°F Lo 53°F Hi 77`F Lo 51°F Hi 71°F Lo 46°F Hi 58°F Lo 33°F Hi 46°F Lo 23°F Hi 35°' <br /> Avg.Wind Speed 5 mph 5 mph 6 mph 7 mph 7 mph 8 mph <br /> Avg.Precipitation 5.2 in 4 2 in 2.1 in 1.5 in 0.8 in 0 9 in <br /> Average Humidity 55% 54% 51% 51% 55% 69% <br /> Avg.Cloud Cover 29% 25% 19% 16% 16% 26% <br /> Pressure Average 30.0 in 30.0 in 30.0 in 30.0 in 30.1 in 30.1 it <br /> Average Dry Days 15 18 23 23 24 23 <br /> Avg.Precip.Days 16 14 7 6 3 5 <br /> Avg Snow Days 0 0 0 2 3 4 <br /> Average Fog Days 0 0 0 0 0 0 <br /> Average UV Index 4 5 4 2 2 1 <br /> Avg.Hours of Sun 263 287 287 308 302 276 <br /> 6.4.12 Exhibit L <br /> Reclamation Costs <br /> Direct Tasks Unit Quantity Cost Total Cost <br /> Grading Highwalls <br /> 3H:1 V Pushdown Hours 15 $4,500.00 <br /> (200'x20')Dozer <br /> Placing Topsoil/Fines <br /> 30 Acres <br /> Bull Dozer Hours 2 $145.00 $290.00 <br /> Loader Hours 2 $145.00 $290.00 <br /> Seeding <br /> Discing/Chiseling Hours 2 $300.00 $600.00 <br /> Drilling Hours 3 $300.00 $900.00 <br /> Seed Mix Acre 1 $700.00 $700.00 <br /> Mulch Acre 1 $187.50 $187.50 <br /> Tracking seed/mulch <br /> Dozer Hours 0.33 $154.00 $50.82 <br /> Area Reclaimed Acre 30 $95,049.60 <br /> Mobilization Fee Hours 1 $1000 $1,000.00 <br /> Indirect Tasks <br /> Liability Insurance 0.0155 $1,473.00 <br /> Performance Bond 0.015 $1,425.00 <br /> Profit 0.05 $4,750.00 <br /> Job Superintendent Hours 20 $88.00 $1,760.00 <br /> Miscellaneous Indirect $0.00 <br /> Total Bond $109,957.00 <br /> Page 17 of 24 <br />