Laserfiche WebLink
COST SUMMARY WORK <br /> Task description:Bond Reduction <br /> Site: Gunnison River Gravel Pits Permit Action:Bond Reduction Permit/Job#:M2009048 <br /> PROJECT IDENTIFICATION <br /> Task#:ACY State: Colorado Abbreviation:None Date: 1/6/2025 County:Mesa Filename: M048 User:ACY <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS <br /> Task Description Form Fleet Task Cost <br /> Used Size Hours <br /> 000 Walk Away Provision-Pit 5 NA 1 1.00 $12,404.00 <br /> 002 Pit 1-Regarde highwalls Complete DOZER 0 0 $0 <br /> 003 Pit 1-Topsoil application Complete DOZER 0 0 $0 <br /> 004 Pit 1-Reveg REVEGE 1 4.00 $2,657.00 <br /> 005 Pit 5-Rip Stockpile area Complete RIPPER 0 0 $0 <br /> 006 Pit 5-Topsoil application Complete DOZER 0 0 $0 <br /> 007 Pit 5-Reveg REVEGE 1 16.00 $15,607.00 <br /> 008 Initial Mob Complete MOBILIZE 0 0 $0 <br /> 009 * Secondary Mob MOBILIZE 1 3.06 $1,645.00 <br /> SUBTOTALS: 24 .06 $32,313.00 <br /> *Left in mobilization of equipment to re track slopes prior to hydro seeding <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance:2.02 Total=$652.92 <br /> Performance bond: 1.05 Total=$323 <br /> Job superintendent: 58.22 Total=$1,400.77 <br /> Profit: 10.00 Total=$3,232.30 <br /> TOTAL O&P=$2,376.69 <br /> CONTRACT AMOUNT(direct+O&P)=$37,921.99 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs):10 Total=$0 <br /> Engineering work and/or contract/bid preparation:0.00 Total=$0 <br /> Reclamation management and/or administration:5.00$4,365 <br /> CONTINGENCY:0.00 Total=$0 <br /> TOTAL INDIRECT COST=$6,741.69 <br /> TOTAL BOND AMOUNT(direct+indirect)=$39,054.69 <br /> Gunnison River Gravel Pits <br /> M-2009-048 <br />