Laserfiche WebLink
Total job cost:LO <br /> CIRCES Cost Estimating Software <br /> Bulldozer Worksheet Cont'd Task#006 Page 1 of 2 BULLDOZER WORK <br /> Task description:Pit 5-Topsoil application <br /> Site:Gunnison River Gravel Pits Permit Action:TR-3 Permit/Job#:M2009048 <br /> PROJECT IDENTIFICATION <br /> Task#:006 Pit 5 Topsoil application Complete <br /> State:Colorado Abbreviation:None Date:5/1/2019 County:Mesa Filename:M048-006 User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower:310 <br /> Blade Type: Semi-Universal <br /> Attachment:NA <br /> Shift Basis: 1 per day <br /> Data Source:(CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour:$93.62 NA <br /> Operating Cost/Hour: $73.35 100 <br /> Ripper own.Cost/flour:$0.00 NA <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $40.23 NA <br /> Total unit Cost/Hour: $207.20 <br /> Total Fleet Cost/Hour:$414.41 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 7,529 <br /> Swell factor: 1.115 <br /> Loose volume:8,395 LCY <br /> Source of estimated volume: 10"depth over 7 ac above water <br /> Source of estimated swell factor:Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 300 feet <br /> Unadjusted hourly production:291.4 LCY/hr <br /> Materials consistency description:Loose stockpile 1.2 <br /> Average push gradient:0% <br /> Average site altitude:4.670 feet <br /> Material weight:2,1001bs/LCY <br /> Weight description:Earth-Loam <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750(AVG.) <br /> Material consistency: 1.200(CAT HB) <br /> Dozing method: 1.000(GEN.) <br />