My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-22_REVISION - M2009048
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009048
>
2025-01-22_REVISION - M2009048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2025 7:17:21 AM
Creation date
1/22/2025 2:39:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009048
IBM Index Class Name
Revision
Doc Date
1/22/2025
Doc Name
Request for Surety Reduction
From
CW Construction, LLC
To
DRMS
Type & Sequence
SR1
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total job cost:LO <br /> CIRCES Cost Estimating Software <br /> Bulldozer Worksheet Cont'd Task#006 Page 1 of 2 BULLDOZER WORK <br /> Task description:Pit 5-Topsoil application <br /> Site:Gunnison River Gravel Pits Permit Action:TR-3 Permit/Job#:M2009048 <br /> PROJECT IDENTIFICATION <br /> Task#:006 Pit 5 Topsoil application Complete <br /> State:Colorado Abbreviation:None Date:5/1/2019 County:Mesa Filename:M048-006 User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower:310 <br /> Blade Type: Semi-Universal <br /> Attachment:NA <br /> Shift Basis: 1 per day <br /> Data Source:(CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour:$93.62 NA <br /> Operating Cost/Hour: $73.35 100 <br /> Ripper own.Cost/flour:$0.00 NA <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $40.23 NA <br /> Total unit Cost/Hour: $207.20 <br /> Total Fleet Cost/Hour:$414.41 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 7,529 <br /> Swell factor: 1.115 <br /> Loose volume:8,395 LCY <br /> Source of estimated volume: 10"depth over 7 ac above water <br /> Source of estimated swell factor:Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 300 feet <br /> Unadjusted hourly production:291.4 LCY/hr <br /> Materials consistency description:Loose stockpile 1.2 <br /> Average push gradient:0% <br /> Average site altitude:4.670 feet <br /> Material weight:2,1001bs/LCY <br /> Weight description:Earth-Loam <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750(AVG.) <br /> Material consistency: 1.200(CAT HB) <br /> Dozing method: 1.000(GEN.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.