24WBRA DH Abandon Groundl tog P2021-008
<br /> Method of Reclaiming drill site surface
<br /> Hoke Plugging Method disturbance Notes
<br /> No casing,surface or otherwise was left in the hole.The hole If present,a sump was backfilled and then the
<br /> backfilled with dry cuttings or if wet cuttings.the sump was pad regraded to approximate natural surface
<br /> pumped back into the hole to within 5 feet of the surface, before disturbance,reserved topsoil respread,
<br /> then a spider-type plug was placed and then b,ckfilled to the then seeded with an approved mix and then
<br /> surface with high-quality bentonite chips. raked/harrowed to cover seeds
<br /> No casing,surface or otherwise was left in the mole.The hole If present,a sump was backfilled and then the
<br /> backfilled with dry cuttings or if wet cuttings,the sump was pad regraded to approximate natural surface
<br /> pumped back into the hole to within 5 feet of the surface, before disturbance,reserved topsoil respread,
<br /> then a spider-type plug was placed and then backfilled to the then seeded with an approved mix and then
<br /> surface with high-quality bentonite chips. raked/harrowed to cover seeds
<br /> No casing,surface or otherwise was left in the liole.The hole If present,a sump was backfilled and then the
<br /> backfilled with dry cuttings or if wet cuttings,the sump was pad regraded to approximate natural surface
<br /> pumped back into the hole to within 5 feet of the surface, before disturbance,reserved topsoil respread,
<br /> then a spider-type plug was placed and then backfiged to the then seeded with an approved mix and then
<br /> surface with I sigh-quality bentonite chips. raked/harrowed to cover seeds
<br /> No casing,surface or otherwise was left in the hole.The hole If present,a sump was backfilled and then the
<br /> backfilled with dry cuttings or if wet cuttings,tlto sump was pad regraded to approximate natural surface
<br /> pumped back into the hole to within 5 feet of the surface, before disturbance,reserved topsoil respread,
<br /> then a spider-type plug was placed and then backfilled to the then seeded with an approved mix and then
<br /> surface with high-quality bentonite chips. raked/harrowed to cover seeds
<br /> No casing,surface or otherwise was left in the(tole.The hole If present,a sump was backfilled and then the
<br /> backfilled with dry cuttings or if wet cuttings,the sump was pad regraded to approximate natural surface
<br /> pumped back into the hole to within 5 feet of the surface, before disturbance,reserved topsoil respread,
<br /> then a spider-type plug was placed and then b,+ckfilled to the then seeded with an approved mix and then
<br /> surface with high-quality bentonite cl sips. rakedtharrowed to cover seeds
<br /> No casing,surface or otherwise was left in the dole.The hole If present,a sump was backfilled and then the
<br /> backfilled with dry cuttings or if wet cuttings,tl ie sump was pad regraded to approximate natural surface
<br /> Pumped back into the hole to within 5 feet of the surface, before disturbance,reserved topsoil respread,
<br /> then a spider-type plug was placed and then backfilled to the then seeded with an approved mix and then
<br /> surface with high-quality bentonite chips. raked/harrowed to cover seeds
<br /> No casing,surface or otherwise was left in the hole.The hole If present,a sump was backfilled and then the
<br /> backfilled with dry tunings or if wet cuttings,tlto sump was pad regraded to approximate natural surface
<br /> pumped back into the hole to within 5 feet of the surface, before disturbance,reserved topsoil respread,
<br /> then a spider-type plug was placed and then backfilled to the then seeded with an approved mix and then
<br /> surface with high-quality bentonite chips. faked/harrowed to cover seeds
<br /> No casing,surface or otherwise was left in the hole.The hole If present,a sump was backfilled and then the
<br /> backfilled with dry cuttings or if wet cuttings,the sump was pad regraded to approximate natural surface
<br /> pumped back into the hole to within 5 feet of the surface, before disturbance,reserved topsoil respread,
<br /> then a spider-type plug was placed and then backfilled to the then seeded with an approved mix and then
<br /> surface with high-quality bentonite chips. raked/harrowed to cover seeds
<br /> No casing,surface or otherwise was left in the hole.The hole If present,a sump was backfilled and then the
<br /> backfilled with dry cuttings or d wet cuttings,the sump was pad regraded to approximate n atural surface
<br /> pumped back into the hole to within 5 feet of the surface, before disturbance,reserved topsoil respread,
<br /> then a spider-type plug was placed and then backfiled to the then seeded with an approved mix and then
<br /> surface with Itigh-quality bentonite chips, raked/harrowed to cover seeds
<br /> Page 3
<br />
|