My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-14_PERMIT FILE - M2025003
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2025003
>
2025-01-14_PERMIT FILE - M2025003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2025 7:50:12 AM
Creation date
1/14/2025 9:29:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2025003
IBM Index Class Name
Permit File
Doc Date
1/14/2025
Doc Name
Application
From
CRS LLC
To
DRMS
Email Name
LDS
AME
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Product. Both the concentrate and the By-Product will be removed from the site no later than the <br /> end of every week. The benign By-Product will be hauled off site, with the concentrates being <br /> shipped to the refinery. <br /> The RGRP circuit elements are fixed to mobile trailers, with some elements that can be towed <br /> individually; the intent is to be able to easily relocate the circuit once this project is completed <br /> and a new project/site becomes available/permitted. <br /> The circuit utilizes a Zero Liquid Discharge (ZLD)recirculating process water system. All water <br /> on site is stored in tanks with secondary containment measures(110% capacity of the primary <br /> containment). Approximately 412gpm will be required in the circuit, water lost through <br /> evaporation will be replaced as needed by a third-party water delivery service. We are in <br /> discussions with Foothills Water Services LLC located in Conifer, CO about this service. The <br /> project will not encounter/impact surface or ground water.No water will be discharged on site. <br /> The RGRP water circuit will be tested daily to ensure the pH does not exceed 8.5, quicklime and <br /> or Sodium Bisulfate will be added to the circuit as needed to maintain circuit pH range of 6.4 - <br /> 8.4. There will be no on-site stocking/storage of any additives or water treatment chemicals. The <br /> quicklime and sodium bisulfate will be purchased, brought on site and added to the circuit on an <br /> as needed basis. If any byproduct material or oversized remains are piled overnight or when the <br /> circuit is not in operation,the temporary stockpiles will be covered with tarps as well as <br /> surrounded with drainage waddles/silt fencing to eliminate erosion or the traveling of material • <br /> that could have the chance of being exposed to moisture. No toxic or hazardous material is used <br /> in the circuit, <br />
The URL can be used to link to this page
Your browser does not support the video tag.