Laserfiche WebLink
Product. Both the concentrate and the By-Product will be removed from the site no later than the <br /> end of every week. The benign By-Product will be hauled off site, with the concentrates being <br /> shipped to the refinery. <br /> The RGRP circuit elements are fixed to mobile trailers, with some elements that can be towed <br /> individually; the intent is to be able to easily relocate the circuit once this project is completed <br /> and a new project/site becomes available/permitted. <br /> The circuit utilizes a Zero Liquid Discharge (ZLD)recirculating process water system. All water <br /> on site is stored in tanks with secondary containment measures(110% capacity of the primary <br /> containment). Approximately 412gpm will be required in the circuit, water lost through <br /> evaporation will be replaced as needed by a third-party water delivery service. We are in <br /> discussions with Foothills Water Services LLC located in Conifer, CO about this service. The <br /> project will not encounter/impact surface or ground water.No water will be discharged on site. <br /> The RGRP water circuit will be tested daily to ensure the pH does not exceed 8.5, quicklime and <br /> or Sodium Bisulfate will be added to the circuit as needed to maintain circuit pH range of 6.4 - <br /> 8.4. There will be no on-site stocking/storage of any additives or water treatment chemicals. The <br /> quicklime and sodium bisulfate will be purchased, brought on site and added to the circuit on an <br /> as needed basis. If any byproduct material or oversized remains are piled overnight or when the <br /> circuit is not in operation,the temporary stockpiles will be covered with tarps as well as <br /> surrounded with drainage waddles/silt fencing to eliminate erosion or the traveling of material • <br /> that could have the chance of being exposed to moisture. No toxic or hazardous material is used <br /> in the circuit, <br />