Laserfiche WebLink
i. (Summary) - daily <br /> A C D L F G H I 1 K <br /> t Example Aug Plan <br /> 2 Summary <br /> 3 Water Year <br /> 4 2021 <br /> 5 <br /> 6 <br /> Depletions&ohRBatlens Replacements <br /> 7 <br /> Call Is Plan In <br /> DA7[ Priority? Lagged OOP Lagged RFOs Total Aug Station pord Total Balance Net Effect <br /> 8 Depletions Depletions Release Credits <br /> 9 0102345 0103456 <br /> 10 IadMinno.) (y/n) {Cfs) (ds} Ids) (65) (dsl Islet (ch) (efs) ct;I <br /> 11 11J J {2) (3) l4) {51 (6) M (9) (9) (10) 1.1) <br /> 26 11/1S/2020 21698.00000 n 0.09 0,03 0.03 0.06 0,00 Des 0.06 -001 0.01 <br /> 27 11/16/2020 21698 00000 n 0.03 0.03 0.03 0.06 000 0 06 0.0E 0.00 <br /> 28 11/17/2020 21698,DOOM n 0.03 0.03 0.03 0.06 0W 0,06 0.06 0.00 0,00 <br /> 29 11/18/2020 21698.D0000 n 0.03 0.03 0.03 D.06 coo 0,06 0.05 0.0C 0,00 <br /> 30 11/19/2020 99999.00000 y 0.D3 0.00 0.03 0.03 000 005 0.00 0,06 <br /> 31 11/20/2020 99999.00000 y O.W 000 0.03 D.03 OAO .05 0.00 006 <br /> 32 11/21/2020 99999.DOD00 y 0.03 0.00 0.03 3.03 0.05 .0,C1 0,05 <br /> 33 -l/22/2020 21698,00000 n 0.03 0A3 0.03 C 0.05 -0,01 <br /> The Balance column is the balance of Replacements and <br /> actual Depletions/Obligations regardless of whether the <br /> plan is in or out of priority. It is calculated by subtracting <br /> Depletions and Obligations from Replacements. <br /> j. (Summary) - a monthly summary table may be added at the bottom of the Summary tab below <br /> the daily summary <br /> H 1 J K L Ni N <br /> Monthly Summary <br /> Number of clays 9to+Days Lagged OOP Lagged RFOs :.a pug5tation ResRe�ease Total Salante NrtEffect <br /> Plants In PrlOrlty In Priority Depletfont Depletions <br /> =of days) (%J iacRl lac-!t) (ac-ft) Sec-11 {a Ft) fac"I )ac-ft) (ac-RI (ac-ft) <br /> 2 31 4 5 6 (7) E81 (91 610 ill <br /> No,2o C00 09n :77 1.77 1,81 3.50 D.DO 4.26 4.26 0.69 0.69 <br /> Dac.20 0.00 0% -.32 1 32 1.41 273 0.00 4.32 4.32 :.59 1 5 <br /> farr2. 30.00 97% 1.25 0.04 1,15 119 0.00 077 0.77 -1.63 0.69 <br /> Feh-L 29.00 t00% i17 ODO 3,89 0.89 0.00 0.00 000 206 00,E <br /> Mar-21 31.00 t00% 1-17 O.OD 0.88 0,88 DAD O.OD coo -2.05 0.0:' <br /> Apr-21 900 304E 1.25 0.04 0,84 0.88 3.83 0.OD 383 !75 22a <br /> May-21 C00 0% 0-00 0.00 0,00 Doc Poo O.DO 0.00 0.G_ <br /> Jun-2: 0.00 0% 0.00 ODD ODD 000 DDO ODD 000 oc9 <br /> 1u1-2= C.00 014 0.00 0.00 D.00 0." D,DO O.00 - 00C <br /> A0.ug-2,. coo D% 0.00 0.03 0.DO 0-DO 0 DO 0 DC 0.00 <br /> SeP-2 0.00 on 0.00 0.00 0.00 0.00 COG O.CC <br /> Oct-21 0.00 a% 0.00 0 eD D OD D D^ 0.00 D,cc. <br /> Contact&plan Info .. .. - e Pond SummaryFD_ i rlersion <br /> Net Effect is the Balance or Net Impact value with the <br /> priority of the plan included. Plans considered in priority <br /> may not be required to replace depletions. This column <br /> represents whether the Aug plan shows injury to the river <br /> or has sufficiently replaced its uses. <br /> Questions can be submitted to Ask DWR by visiting the DWR homepage at: dwr.colorado.2ov/ Page 15/15 <br />