My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-07_GENERAL DOCUMENTS - C1981019
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2025-01-07_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 8:16:57 AM
Creation date
1/8/2025 7:48:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
1/7/2025
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company
Type & Sequence
SL23
Permit Index Doc Type
Findings
Email Name
HR1
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Decision and Findings of Compliance <br />Partial Phase I, II and III Bond Release SL-23 Page 2 of 16 <br />Table of Contents <br /> <br />I. Introduction <br />II. Procedures and Summary of Bond Release Process <br />III. Criteria for Bond Release <br />IV. Observations and Findings <br />V. Proposed Decision <br /> <br />Attachments: <br />Table 1. – Field Measurements for Streeter Ditch and Pond <br />Table 2. – PAP Provided Design Criteria for Streeter Dich and Pond <br />Table 3. – Elevational Comparison Analysis for Streeter Dich and Pond <br />Table 4. – Data Collection Point Elevations <br />Table 5. – Summary of All Liability Releases (acres) <br />Table 6. – Summary of All Bond Release Dollars <br />Table 7. – SL-23 Releasable Amount <br />Figure 1. SL-23 Location Map – Streeter Ditch and Streeter Pond <br />Figure 2. SL-23 GPS Collection Point Locations Map – Streeter Ditch and Streeter Pond <br /> <br /> <br />I. INTRODUCTION <br /> <br />This document is the proposed decision of the Colorado Division of Reclamation, Mining and Safety (the Division) <br />in response to a request for Phase I, II, and III bond release at the Colowyo Coal Mine, Division file number C- <br />1981-019. The package contains five parts. These include: 1) Introduction; 2) Procedures and Summary of the <br />Bond Release Process; 3) Criteria and Schedule for Bond Release; 4) Observations and Findings of the Division <br />regarding compliance with the bond release requirements of the Colorado Surface Coal Mining and Reclamation <br />Act and regulations promulgated thereunder; and 5) the Division’s Proposed Decision on the request for bond <br />release. <br /> <br />Detailed information about the review process can be found in the Act and the Regulations of the Colorado Mined <br />Land Reclamation Board for Coal Mining. All Rules referenced within this document are contained within the <br />Regulations. Detailed information about the mining and reclamation operations can be found in the permit <br />application on file at the Division offices, located at 1313 Sherman Street, Room 215, in Denver, Colorado. <br /> <br />The Colowyo Mine is a surface mine which is permitted and operated by the Colowyo Coal Company, LP <br />(Colowyo). The total permit area encompasses 26,173.14 acres. The Colowyo Mine is located approximately <br />25 miles north of the town of Meeker, CO and 25 miles south of the town of Craig, CO in Moffat and Rio <br />Blanco Counties off of Colorado State Highway 13. The land for which bond release has been requested is <br />owned by the Bureau of Land Management (BLM) and Colowyo Coal Company (CCC). The coal within the area <br />in which is being requested with SL-23 is Federal (BLM) and CCC owned. The Streeter Ditch and Streeter Pond <br />being requested for Phase I, II and III bond release under the SL-23 application were constructed throughout the <br />1970’s and 1980’s and remain stable and functional. <br />
The URL can be used to link to this page
Your browser does not support the video tag.