Laserfiche WebLink
Proposed Decision and Findings of Compliance <br />Partial Phase I, II and III Bond Release SL-23 Page 14 of 16 <br /> <br />Table 7. SL-23 Releasable Amount <br /> <br />Task (Phase I, II and III) Cost <br />Regrade Streeter Pond (Task #034) $ 27,075.00 <br />Replace Topsoil from Stockpile to Streeter Pond (Task #080) $ 5,309.00 <br />Reseed Streeter Pond with Grazing Land Seed Mix (Task #108) $ 2,433.00 <br />Excavate Streeter Ditch $ 20,602.00 <br />Pump Streeter Pond Prior to Two Cleanings (Task #133 $ 2,382.00 <br />Clean Streeter Pond Two Times (Task #134) $ 20,064.00 <br /> <br />Subtotal of Direct Costs $ 77,865.00 <br />Indirect Costs (rounded to the nearest dollar) $ 43,819.00 <br />Total SL-23 Releasable Amount $ 121,684.00 <br /> <br /> <br /> <br />