My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-19_PERMIT FILE - M2024059 (6)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024059
>
2024-12-19_PERMIT FILE - M2024059 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2024 8:40:22 AM
Creation date
12/23/2024 8:22:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024059
IBM Index Class Name
Permit File
Doc Date
12/19/2024
Doc Name
Application
From
Western Slope Materials
To
DRMS
Email Name
TJ1
THM
EL1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Provide a report to Garfield County staff and the DRMS with details of the exceedance, <br /> mitigation measures, and results. <br /> 4.8. Reporting <br /> Baseline water quality and quantity data for the initial five quarters will be reported to the <br /> CDRMS prior to operations. Reporting of POC data will be included with the mine's annual <br /> report. Data reporting will be in table format and graph format when necessary. <br /> 4.9. Sampling Quality Assurance Project Plan (QAPP) <br /> WSM's quality assurance methods for water sampling includes only using Colorado State <br /> certified laboratories with an industry standard Quality Assurance/Quality Control plan in place. <br /> On-site quality assurance for field sampling is included in the Sampling Procedure described in <br /> Section 1.4. Certain steps of the procedure such as clearing three well volumes before sampling <br /> and using cleaned and calibrated testing equipment help to ensure that the testing results are <br /> accurate and free of altering contaminants. Any samples that are collected will include <br /> information on who took the sample, when it was taken, sample identification, and the chain of <br /> custody. A sample data collection sheet from previous baseline monitoring at the site is <br /> provided in Appendix 5. <br /> • <br /> North Hangs Mine GW Monitoring <br /> Plan 13 U Lewicki& Associates <br /> December 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.