Laserfiche WebLink
Contents <br /> Introduction 1 <br /> 1. Background Information 2 <br /> 1.1. Site Description 2 <br /> 1.2. Baseline Groundwater Characterization 4 <br /> 2. Predicted Impacts to Hydrologic Balance 6 <br /> 3. Groundwater Monitoring Plan 7 <br /> 3.1. Groundwater Points of Compliance 7 <br /> 4. Sampling Methods 8 <br /> 4.1. Sampling Location 8 <br /> 4.2. Sampling Frequency 8 <br /> 4.3. Sampling Parameters 8 <br /> 4.4. Sampling Procedure • 10 <br /> 4.5. Analytical Procedures 12 <br /> 4.6. State Water Quality Standards 12 <br /> 4.7. Reporting 13 <br /> 4.8. Sampling Quality Assurance Project Plan (QAPP) 13 <br /> Appendix 1 - Map 14 <br /> Appendix 2 - Baseline Groundwater Quality Data 15 <br /> Appendix 3 — CDWR Permits 18 <br /> Appendix 4 — Industry Standard Field Sampling Sheet 19 <br /> Appendix 5 —Sample Data Report 20 <br /> North Hangs GW Monitoring <br /> Plan Lewicki& Associates <br /> December 2024 <br />