Laserfiche WebLink
116 06/2024 <br />TOPSAND <br />Quantities Required <br />B-Pit (24 inches) 0 BCY <br />Long-term spoil area (15 inches) 0 BCY <br />Topsand piles A-I, A-3, B-l and B-2 (6 inches) 0 BCY <br />Facilities area ( 6 inches) 0 BCY <br />Access Roads (24 inches) 0 BCY <br /> Total 0 BCY <br /> <br />Stockpiled Quantities <br />Topsand piles A-I, B-1, B-2 and A-3 0 BCY <br /> - 0 BCY-from above <br /> Total Remaining 0 BCY surplus <br /> <br /> <br /> <br />CEC replaced 24 inches of topsand on the A- and B-Pit disturbed areas, as well as on the <br />temporary access and haul roads. The long-term spoil area recieved 15 inches of topsand, and the <br />facilities area and the topsand piles received six (6) inches of topsand over the in place sub-soils. <br />Upon completion of the A/MWR disposal operation in either pit area, all waste will be removed <br />or buried to prevent water pollution or adverse visual impacts. Non-salvageable materials will be <br />buried in the pits above the local ground water levels, and at least to four (4) feet below AOC. <br />The final pit highwalls will also be backfilled to AOC. It is noteworthy that there are no acid- <br />forming materials in the coal seam per indications in the sump water data (refer to Section 2.04.7 <br />in this document). <br />Structures previously used in the CEC mining operation will be removed unless moved to an <br />alternate use designation, and the local ground area will be scarified, topsanded, fertilized and <br />revegetated. Facilities and structures moved to an alternate use designation consistent with a <br />post-mining land use of Industrial/Commercial will not require any additional reclamation work <br />to satisfy reclamation liability and bond release requirements.