My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-16_GENERAL DOCUMENTS - M1979116HR
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1979116
>
2024-07-16_GENERAL DOCUMENTS - M1979116HR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 2:40:30 PM
Creation date
12/19/2024 2:24:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979116HR
IBM Index Class Name
General Documents
Doc Date
7/16/2024
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HISTORICAL PRESERVATION <br /> Areas adjacent to the mine sites often contain related artifacts and structures, such as buildings, <br /> tipples, ore houses, headframes and foundations that may be historically significant. Care shall <br /> be exercised to avoid any effect to these structures and artifacts, in order to preserve their <br /> integrity. Existing structures, except shaft timbering, shall not be used as load-bearing devices. <br /> PROJECT WORK DESCRIPTION <br /> The attached General Conditions apply to all work. The attached Purchase Order Terms and <br /> Conditions or the Construction Agreement apply to all work depending on award amount. <br /> The following descriptions delineate the Work, materials, and how measurements of completed <br /> Work will be made and paid for, for each bid item in the Bid Schedule. The Bidder is to read <br /> these definitions and price their proposal accordingly. <br /> ITEM 1.0 MOBILIZATION/DEMOBILIZATION <br /> This item includes those measures necessary and incidental to move equipment and supplies <br /> onto the Project Area, to move equipment within the Project Area, and to complete any other <br /> requirements necessary to accomplish the goals of this Project. This item also includes all labor, <br /> equipment, and costs associated with demobilization and clean-up of the work site following <br /> completion of the Project. Please see Specification 1.0, Mobilization / Demobilization of the <br /> General Bid Specifications, 2009. <br /> CONTRACTOR must comply with the following provisions during performance of this Project: <br /> No clearing will be conducted without prior approval of the PROJECT MANAGER and without <br /> an approved sediment control structure in place and functional, as required by PROJECT <br /> MANAGER, until construction is completed. Generally, silt fence, installed per manufacturer's <br /> specifications and Section 22.4 of the General Bid Specifications, 2009 is acceptable as a <br /> sediment control measure. <br /> CONTRACTOR will dispose of waste materials, including but not limited to refuse, garbage, <br /> sanitary wastes, spent solvents; oil and other petroleum products off of the Project Area in <br /> accordance with applicable laws and regulations. CONTRACTOR will specify to PROJECT <br /> MANAGER proposed methods for all waste collection and disposal, modes of waste transport, <br /> and waste disposal facilities and locations CONTRACTOR and subcontractors will use while <br /> performing the work, including making any necessary arrangements for waste collection and <br /> disposal. Any fees or charges required to be paid for collection, transport or disposal of waste <br /> materials shall be paid by CONTRACTOR. <br /> At its expense, CONTRACTOR will comply with all applicable federal, state, and local laws, <br /> ordinances, rules and regulations relating to the work, the site, and any materials and/or <br /> equipment provided by CONTRACTOR. <br /> Page 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.