Laserfiche WebLink
This project is funded 100% through monies made available to the State of Colorado <br /> through revocation of bond monies retained by the Division of Reclamation, Mining and <br /> Safety for reclamation of this previously permitted mining operation. <br /> AMERICANS WITH DISABILITIES ACT <br /> All programs, services and activities of the Department of Natural Resources, Division <br /> of Reclamation, Mining and Safety and the Colorado Mined Land Reclamation Board <br /> are operated in compliance with the Americans with Disabilities Act. Details can be <br /> found online at https://dnr.colorado.gov/accessibility. <br /> CORA DISCLOSURE <br /> To the extent not prohibited by federal law, this Contract and the performance measures <br /> and standards under CRS 24-103.5-101, if any, are subject to public release through the <br /> Colorado Open Records Act, CRS 24-72-101, et.seq. <br /> PROJECT WORK DESCRIPTION <br /> The attached General Conditions of the Contract and Purchase Order Terms and <br /> Conditions apply to all work. <br /> ITEM 1.0 MOBILIZATION/DEMOBILIZATION <br /> This item includes those measures necessary and incidental to move equipment and <br /> supplies onto the Project Area, to move equipment within the Project Area, and to <br /> complete any other requirements necessary to accomplish the goals of this Project. This <br /> item also includes all labor, equipment, and costs associated with demobilization and <br /> clean-up of the work site following completion of the Project. Please see Specification <br /> 1 .0, Mobilization / Demobilization of the General Bid Specifications, 2009. <br /> CONTRACTOR must comply with the following provisions during performance of this <br /> Project: <br /> No clearing will be conducted without prior approval of the PROJECT MANAGER and <br /> without an approved sediment control structure in place and functional, as required by <br /> PROJECT MANAGER, until construction is completed. Generally, silt fence, installed per <br /> manufacturer's specifications and Section 22.4 of the General Bid Specifications, 2009 is <br /> acceptable as a sediment control measure. <br /> CONTRACTOR will dispose of waste materials, including but not limited to refuse, <br /> garbage, sanitary wastes, spent solvents; oil and other petroleum products off of the <br /> Project Area in accordance with applicable laws and regulations. CONTRACTOR will <br /> specify to PROJECT MANAGER proposed methods for all waste collection and disposal, <br /> modes of waste transport, and waste disposal facilities and locations CONTRACTOR and <br /> Page 6 of 11 <br /> Rev. 7/15/2022 <br />