My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-08-06_GENERAL DOCUMENTS - M1996013
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1996013
>
2022-08-06_GENERAL DOCUMENTS - M1996013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 2:40:05 PM
Creation date
12/19/2024 2:16:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996013
IBM Index Class Name
General Documents
Doc Date
8/6/2022
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HASTY TREE PLANTING PROJECT <br /> STANDARD WORK SPECIFICATIONS <br /> SAFETY, HEALTH, & ENVIRONMENTAL ACTION PLAN RESPONSE ITEMS <br /> The following is a summary list of items that must be addressed in writing by the <br /> CONTRACTOR. All items that are checked (0) apply to the work to be performed and <br /> must be addressed in a written plan. Each employee is to read and sign the plan as part <br /> of the project orientation prior to starting work on the project. <br /> A. SITE ACCESS <br /> No person may enter the job site without first receiving hazard training X <br /> from CONTRACTOR'S safety representative. <br /> CONTRACTOR employees are required to travel to and from theirwork X <br /> areas by designated routes. <br /> All CONTRACTOR equipment is subject to a safety inspection before X <br /> entering the 'ob site. <br /> B. PART 48 TRAINING REQUIREMENTS <br /> Each CONTRACTOR employee shall receive orientation training, <br /> provided by the CONTRACTOR, comprised of all aspects of the X <br /> contract's Safety, Health and Environmental Action Plan (SHEAP). <br /> C. SUBSTANCE ABUSE SCREENING <br /> Alcohol and drugs are not allowed on the job site. X <br /> D. PROACTIVE SAFETY <br /> The CONTRACTOR shall designate one person to be the safety X <br /> representative responsible for safety and health at the work site. <br /> The CONTRACTOR shall conduct safety meetings at least weekly. X <br /> All safety meetings shall be documented and include the date, subject X <br /> matter, trainer and all participants signatures. <br /> Daily pre-job safety talks shall be given by the CONTRACTOR. X <br /> Any change in the daily work plan shall be communicated by the X <br /> CONTRACTOR to all affected personnel. <br /> The CONTRACTOR shall conduct daily work area inspections. X <br /> These inspections shall be documented in an approved book. N/A <br /> Colorado Division of Reclamation, Mining and Safety SPECIFIC CONDITIONS <br /> SHEAP <br /> As of 6/20/2012 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.