Laserfiche WebLink
E. The Contractor shall provide certificates showing insurance coverage required by <br /> this contract to the State within ten days of the notice of award. No later than 15 days <br /> prior to the expiration date of any such coverage, the Contractor shall deliver the State <br /> certificates of insurance evidencing renewals thereof. At any time during the term of this <br /> contract, the State may request in writing, and the Contractor shall thereupon within 10 <br /> days supply to the State, evidence satisfactory to the State of compliance with the <br /> provisions of this section. <br /> Bidders are advised to consult with their insurance carrier concerning these requirements. <br /> Submit a bid only if you are prepared to complete these requirements. <br /> PROJECT FUNDING. <br /> This project is funded 100% through monies made available to the State of Colorado <br /> through revocation of bond monies retained by the Division of Reclamation, Mining and <br /> Safety for reclamation of this previously permitted mining operation. <br /> AMERICANS WITH DISABILITIES ACT <br /> All programs, services and activities of the Department of Natural Resources, Division of <br /> Reclamation, Mining and Safety and the Colorado Mined Land Reclamation Board are <br /> operated in compliance with the Americans with Disabilities Act. Details can be found <br /> online at.https://dnr.colorado.gov/accessibility. <br /> CORA DISCLOSURE <br /> To the extent not prohibited by federal law, this Contract and the performance measures <br /> and standards under CRS 24-103.5-101, if any, are subject to public release through the <br /> Colorado Open Records Act, CRS 24-72-101 , et.seq. <br /> PROJECT WORK DESCRIPTION <br /> The DRMS General Conditions and Purchase Order Terms and Conditions apply to all <br /> work. <br /> The following descriptions delineate the Work, materials, and how measurements of <br /> completed Work will be made and paid for, for each bid item in the Bid Schedule. The <br /> Bidder is to read these definitions and price their proposal accordingly. <br /> ITEM 1.0 MOBILIZATION/DEMOBILIZATION <br /> This item includes those measures necessary and incidental to move equipment and <br /> supplies onto the Project Area, to move equipment within the Project Area, and to <br /> complete any other requirements necessary to accomplish the goals of this Project. This <br /> item also includes all labor, equipment, and costs associated with demobilization and <br /> Page 5 of 10 <br /> Rev.01/31/2024 <br />