Laserfiche WebLink
Brannan Sand and Gravel Company - Valley's Edge Resource SWSP Renewal Request <br /> October 31, 2023 <br /> Table 1.Projected use and depletions from November 1,2023 -October 31, 2024 <br /> Depletions Totals and Deliveries <br /> Pumped from Pit Evaporation <br /> Production <br /> Aggregate y y p pose Needed <br /> t below GW Water Water Subtotal Monthly Monthly Eva Ex d � Aurora <br /> Total CU Including <br /> Production but ins Retained in Retained in Water used Consumption Gross Gross Precip. Evap. After Eff Water Su6iotel Depletion Delivery <br /> abv GW dewatered Product abv Product in for Dust of Pumped Evap Evap Brighton Credit Precip Surface Evap (ac-ft) (ac-ft) <br /> transit Schedule <br /> Month (tons) state(tons) GW GW Control Water (%) (ft) (ft) (70%)(ft)Credit(ft) (acres) Losses Losses <br /> Nov-24 0 0 0.00 0.00 0.17 0.17 4.0 0.15 0.06 0.04 0.11 16.0 1.69 1.86 -4.54 -4.90 4.80 <br /> Dec-24 0 0 0.00 0.00 0.17 0.17 3.0 0.11 0.04 0.03 0.08 16.0 1.32 1.49 -4.68 -4.95 4.95 <br /> Jan-25 0 0 CLOD 0.00 0.17 0.17 3.0 0.11 0.04 0.02 0.09 16.0 1.41 1.58 460 -4.87 4.87 <br /> Feb-25 0 0 0.00 0.00 0.17 0.17 3.5 0.13 0.03 0.02 0.11 16.0 1.74 1.91 -4.05 -4.29 4.29 <br /> Mar-25 0 0 0.00 0.00 0.17 0.17 5.5 0.21 0.09 0.06 0.14 16.0 2.26 2.43 -4.36 -4.61 4.61 <br /> Apr-25 0 0 0.00 0.00 0.34 0.34 9.0 0.34 0.15 0.10 0.23 16.0 3.76 4.10 -4.10 -4.61 4.61 <br /> May-25 0 0 0.00 0.00 0.34 0.34 12.0 0.45 0.19 0.14 0.31 16.0 5.03 5.37 -4.14 -4.65 4.65 <br /> Jun-25 20,000 5,000 0.29 0.15 0.80 1.24 14.5 0.54 0.13 0.09 0.45 16.0 7.21 8.45 -3.97 -4.46 4.46 <br /> Jul-25 20,000 5,000 0.29 0.15 0.80 1.24 15.0 0.56 0.14 0.10 0.47 16.0 7.47 8.71 -4.14 -4.65 4.65 <br /> Aug-25 0 0 0.00 0.01) 0.34 0.34 13.5 0.51 0.14 0.10 0.41 16.0 6.58 6.92 -4.27 -4.80 4.80 <br /> Sep-25 0 0 0.D0 0.00 0.34 0.34 10.0 0.38 0.08 0.06 0.32 16.0 5.11 5.45 -4.29 -4.82 4.82 <br /> Oct-25 0 0 0.00 0.00 0.17 0.17 7.0 0.26 0.08 0.05 0.21 16.0 3.34 3.51 -4.58 -5.15 5.15 <br /> Annual Total 40,000 10,000 0.59 0.29 3.98 4.. 1W 3.75 1.17 0.82 2.93 46.91 1 11.78 1 -51.72 -56.66 56.66 <br /> Assumes transit losses from Hite Facil ily: <br /> 22 miles <br /> 0.25%/mi Nov-Mar 5.5%Total <br /> 0.5o%/mi Apr-Oct tr.o%Total <br /> 3. PLAN OPERATION AND CONTACT <br /> Due to the location of the replacement source from Aurora,transit losses will be assessed <br /> from the point of introduction to the stream down to the location of stream depletions, <br /> resulting in a total delivery to the stream of 56.66 AF during the approval period as shown <br /> in Table 1. The lease agreement with the City of Aurora is currently being finalized. Please <br /> see the previous lease agreement and an email from City of Aurora staff confirming that the <br /> lease will be renewed for this period. The final lease agreement will be provided once it is <br /> fully executed. <br /> Brannan will track actual on-site aggregate production,water use for dust control, and area <br /> exposed to evaporation. The resulting consumptive use will be lagged and compared to the <br /> available replacements to ensure all depletions are replaced. An accounting form similar to <br /> Table 1 will be prepared and submitted to the Division of Water Resources on a monthly <br /> basis. <br /> The primary point of contact for administration and operation of this SWSP is Steve Kelton: <br /> Steve Kelton <br /> Brannan Companies <br /> 2500 Brannan Way <br /> Denver, CO 80229 <br /> skelton@brannanl.com I desk: 303-383-6433 1 cell: 720-910-4376 <br /> Please feel free to contact me if you need any additional information or have any questions <br /> regarding this request. <br /> DINATALE WATER CONSULTANTS 4 <br />