Laserfiche WebLink
Brannan Sand and Gravel Company -Valley's Edge Resource SWSP Renewal Request <br /> October 31, 2023 <br /> Table 1.Projected use and depletions from November 1,2023 - October 31,2024 <br /> Depletions Totals.and Deliveries. <br /> Pumped from Pit Evaporation <br /> Production ° <br /> Aggregate below GW Water Water Subtotal Monthly Monthly Evap Exposed Lagged Needed Aurora <br /> Production but in a Retained in Retained in Water used Consumption Gross Gross Precip. Evap. After Eff Water Subtotal Total CU_ ac ft D Including epletion Delivery <br /> abv GW dewatered Product abv Product for Dust of Pumped Evap Evap Brighton Credit Precip Surf va ace Ep ( W-ft) Transit <br /> in Schedule <br /> Month (tons) state(tons) GW GW Control Water (%) (ft) (ft) (70%)(ft)Credit(ft) (acres) Losses Losses <br /> Nov-24 0 0 0.00 0.00 0.17 0.17 4.0 OAS 0.06 0.04 0.11 16.0 1.69 1.86 -4.54 -4.80 4.80 <br /> Dec-24 0 D 0.00 0.00 0.17 0.17 3.0 OA1 0.04 0.03 0.08 16.0 1.32 1.49 -4.68 -4.95 4.95 <br /> Jan-25 D 9 0.00 0.00 0.17 D.17 3.0 0.11 O.D4 0.02 0.09 16.0 1.41 1.58 -4.60 -4.87 4.87 <br /> Feb-25 0 0 0.00 0.00 0.17 CA7 3.5 0.13 0,03 0.02 0.11 16.0 1.74 1.91 -4.05 -429 429 <br /> Mar-25 0 0 0.00 0.00 0.17 CA7 5.5 0.21 0.09 0.06 OA4 16.0 2.26 2.43 -4.36 -4.61 4.61 <br /> Apr-25 D D 0.00 0.00 0.34 0.34 9.0 0.34 0.15 OAC 0.23 16.0 3.76 4AC -4.10 -4.61 4.61 <br /> May-25 0 0 0.00 0.00 0.34 0.34 12.0 OAS 0.19 0.14 0.31 16.0 5.03 5.37 -4.14 -4.65 4.65 <br /> Jun-25 20,000 5,000 0.29 OA5 0.80 124 14.5 0.54 0.13 a09 OAS 16.0 7.21 8.45 -3.97 -446 4.46 <br /> Jul-25 20,000 5,000 0.29 OA5 0.80 124 15.0 0.56 0.14 OAC 0.47 16.0 7.47 8.71 -4.14 -4.65 4.65 <br /> Aug-25 0 0 0.00 0.00 0.34 0.34 13.5 0.51 0.14 OAC 0.41 16.0 6.58 6.92 -427 -4.80 4.80 <br /> Sep-25 0 a 0.00 0.00 0.34 0.34 10.0 0.38 0.08 0.06 0.32 16.0 5.11 5.45 -429 -4.82 4.82 <br /> Oct-25 0 It 0.00 0.00 0.17 CA7 7.0 0.26 0.08 0.05 0.21 16.0 3.34 3.51 -4.58 -5.15 SAS <br /> Annual Total 40,000 10,000 0.59 0.29 3.98 4.86 WC 3.71 1.17 0.82 2.93 46.91 51.18 -51.72 -56.66 56.66 <br /> Assumes transit losses from Hite Facilily: <br /> miles <br /> o 15Y(mi Nov-Mar 5 5%Total <br /> o.SOY(mi Apr-Oct it.o%Total <br /> 4 <br />