My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-17_HYDROLOGY - M2016030
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2016030
>
2024-12-17_HYDROLOGY - M2016030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 2:41:45 PM
Creation date
12/19/2024 10:01:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016030
IBM Index Class Name
Hydrology
Doc Date
12/17/2024
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
JPL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2024-2025 Valley's Edge Resource Substitute Water Supply Plan Renewal Page 9 of 10 <br /> December 17, 2024 <br /> evaporation losses and lagged depletions. If a lined pond results after reclamation, <br /> replacement of lagged depletions shall continue until there is no longer an effect on <br /> stream flow. <br /> 19.The State Engineer may revoke this SWSP or add additional restrictions to its <br /> operation if at any time the State Engineer determines that injury to other vested <br /> water rights has occurred or will occur as a result of the operation of this SWSP. <br /> Should this SWSP expire without renewal or be revoked prior to adjudication of a <br /> permanent plan for augmentation, all excavation of the product from below the water <br /> table, and all other use of water at the pit, must cease immediately. <br /> 20. In accordance with amendments to section 25-8-202-(7), C.R.S. and "Senate Bill 89- <br /> 181 Rules and Regulations" adopted on February 4, 1992, the State Engineer shall <br /> determine if the substitute water is of a quality to meet requirements of use to which <br /> the senior appropriation receiving the substitute supply has normally been put. As <br /> such, water quality data or analyses may be requested at any time to determine if the <br /> requirement of use of the senior appropriator is met. <br /> 21.The decision of the State Engineer shall have no precedential or evidentiary force, <br /> shall not create any presumptions, shift the burden of proof, or serve as a defense in <br /> any water court case or any other legal action that may be initiated concerning the <br /> SWSP. This decision shall not bind the State Engineer to act in a similar manner in any <br /> other applications involving other plans or in any proposed renewal of this plan, and <br /> shall not imply concurrence with any findings of fact or conclusions of law contained <br /> herein, or with the engineering methodologies used by the Applicant. <br /> If you have any questions concerning this approval, please contact Wenli Dickinson in the <br /> Denver office at 303-866-3581 or Aliyah Santistevan in the Greeley office at (970) 352-8712. <br />
The URL can be used to link to this page
Your browser does not support the video tag.