Laserfiche WebLink
Closure Cost Estimate <br />Misc. Costs <br />Project Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Miscellaneous Cost Summary <br />Labor Equipment Materials Totals <br />Fence Removal $2,241 $822 N/A $3,063 <br />Fence Installation $1,137 $270 $7,980 $9,387 <br />Culvert & Buried Pipe Removal $1,938 $710 N/A $2,648 <br />Surface Pipe Removal $2,144 $357 N/A $2,501 <br />Power Lines $0 N/A N/A $0 <br />Substations/Transformers $0 N/A N/A $0 <br />Rip-rap, rock lining, gabions $0 $0 $0 $0 <br />Other Costs $0 $0 $0 $0 <br />TOTALS $7,460 $2,159 $7,980 $17,599 <br />Power Line and Substation Removal You must fill in ALL green and blue cells <br /> Input <br />Description <br />(required)ID Code <br />Power Line <br />Length <br />Power Line <br />Type <br />Number of <br />Substations Location <br />Power Line <br />Removal <br />-1 miles (select)#(select)$ <br />$0 <br />Notes:If substation owned by operator, use Other Demo & Equipment Removal sheet <br />Labor/Equipment costs assume approximately 80% of cost are equipment and 20% are labor related costs <br />User may need to add line items in Foundations & Buildings for substation slab demolition and fence removal <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. 3 of 5 Misc. Costs