Laserfiche WebLink
Closure Cost Estimate <br />Waste DisposalProject Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Waste Disposal - Cost Summary <br />Labor Equipment Fees Totals <br />Solid Waste - On Site $905 $1,695 N/A $2,600 <br />Solid Waste - Off Site $0 <br />Hazardous Materials $0 <br />Hydrocarbon Contaminated Soils $0 $0 $0 $0 <br />TOTALS $905 $1,695 $0 $2,600 <br />Waste Disposal - User Input - Solid Waste <br /> Landfill (Bulk) Disposal Dumpster <br />Description <br />(required)ID Code <br />Waste <br />Type <br />Disposal <br />Method Quantity <br />Distance <br />to Landfill <br />Slope to <br />Landfill <br />Number <br />of <br />Trucks <br />Months <br />Dumpster <br />Rental <br />-1 (select)(select)cy ft % grade (user override)months <br />1 Sediment (Pond 1)Waste Mgmt & Disposal Landfill (bulk)4 233872 2.2 <br />2 Sediment (Pond 2)Waste Mgmt & Disposal Landfill (bulk)4 233872 2.2 <br />3 Sediment (Pond 3A)Waste Mgmt & Disposal Landfill (bulk)2 233872 2.2 <br />4 Sediment (Pond 3B)Waste Mgmt & Disposal Landfill (bulk)2 233872 2.2 <br />5 Sediment (Pond 3C)Waste Mgmt & Disposal Landfill (bulk)4 233872 2.2 <br />Notes: <br /> 1. All Physical parameters must be input even if manual overrides for volume or area are used. <br /> 2. If Slope from facility to borrow source is >20, downhill travel time may be underestimated due to limitation of uphill travel time curves and downhill speed tables from CAT Handbook (see Productivty Sheet) <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. Page 1 of 7 Waste Disposal