My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:24:26 AM
Creation date
12/17/2024 7:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Appendix L-1 2021 Reclamation Cost Calculation
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br />Process Ponds <br />Project Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Process Ponds - Cost Summary <br />Labor Equipment Materials Totals <br />Backfilling Costs $1,554 $3,298 N/A $4,852 <br />Growth Media Placement Costs $2,975 $8,305 N/A $11,280 <br />Liner Cutting & Folding Costs $1,515 $780 N/A $2,295 <br />Subtotal Earthworks $6,044 $12,383 $0 $18,427 <br />Revegetation Costs $700 $250 $685 $1,635 <br />TOTALS $6,744 $12,633 $685 $20,062 <br />Process Ponds - Calculations <br />Minimum 1 acre revegetation crew time per area <br />Pond Volume Calculation <br />Revegetation Calculations <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. Page 3 of 6 Process Ponds <br />I I I I I <br />Area and Volume of the Frustrum of a Pyramid <br />Surface Area = ab + eel + (a+b+c+d) x ~ 2 <br />Volume= h (ab+ Cd+,~) <br />3
The URL can be used to link to this page
Your browser does not support the video tag.