My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:24:26 AM
Creation date
12/17/2024 7:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Appendix L-1 2021 Reclamation Cost Calculation
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br />Foundations & Buildings <br />Project Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Buildings & Foundation Demolition Cost Summary <br />Labor Equipment Materials Totals <br />Building Demolition Cost $2,361 $1,667 N/A $4,028 <br />Wall Demolition Cost $0 $0 N/A $0 <br />Slab Demolition $278 $722 N/A $1,000 <br />Subtotal Demolition $2,639 $2,389 $0 $5,028 <br />Cover Placement Cost $3,276 $9,738 N/A $13,014 <br />Growth Media Placement Cost $0 $0 N/A $0 <br />Ripping/Scarifying Cost $0 $0 N/A $0 <br />Subtotal Earthworks $3,276 $9,738 $0 $13,014 <br />Revegetation Cost $420 $150 $342 $912 <br />TOTALS $6,335 $12,277 $342 $18,954 <br />Building & Foundation Demolition Costs Uses RS Means Heavy Construction Cost Data for building and wall demolition cost calculations. Uses CAT Handbook for slab breaking production. <br />Building Demolition Wall Demolition Slab Demolition Total Costs <br />Description <br />(required) <br />Building <br />Footprint <br />(slab area)Building Volume Wall Length Wall Area <br />Slab Demolition <br />Fleet Slab Volume <br />Total <br />Labor <br />Cost <br />Total <br />Equipment <br />Cost <br />Total Building <br />Demolition Cost <br />Total <br />Labor <br />Cost <br />Total <br />Equipment <br />Cost <br />Total <br />Wall Demolition <br />Cost <br />Total <br />Labor <br />Cost <br />Total <br />Equipment <br />Cost <br />Total Slab <br />Breaking Cost <br />Total <br />Labor <br />Cost <br />Total <br />Equipment <br />Cost <br />Total <br />Demolition <br />Costs <br />sqft cu ft ft sq ft cy $$$$$$$$$$$$ <br />1 Cross Snow Shed 1,640 13,120 348 0 325C 20 $2,230 $1,574 $3,804 $0 $0 $0 $139 $361 $500 $2,369 $1,935 $4,304 <br />2 Flow Shed 1 60 480 32 0 325C 1 $82 $58 $140 $0 $0 $0 $139 $361 $500 $221 $419 $640 <br />3 Flow Shed 2 36 288 24 0 325C 0 $49 $35 $84 $0 $0 $0 $0 $0 $0 $49 $35 $84 <br />13,888 21 $2,361 $1,667 $4,028 $0 $0 $0 $278 $722 $1,000 $2,639 $2,389 $5,028 <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. Page 4 of 6 Foundations & Buildings
The URL can be used to link to this page
Your browser does not support the video tag.