My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:24:26 AM
Creation date
12/17/2024 7:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Appendix L-1 2021 Reclamation Cost Calculation
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br />Roads <br />Project Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Roads - Cost Summary <br />Labor Equipment Materials Totals <br />Grading Costs $836 $1,078 N/A $1,914 <br />Cover Placement Cost $2,974 $8,303 N/A $11,277 <br />Ripping/Scarifying Cost $138 $204 N/A $342 <br />Subtotal Earthworks $3,948 $9,585 $13,533 <br />Revegetation Cost $280 $100 $696 $1,076 <br />TOTALS $4,228 $9,685 $696 $14,609 <br />Roads - Regrading Costs <br />Description <br />(required) <br />Regrading <br />Volume <br />Recontouring <br />Fleet <br />Fleet <br />Productivity Total Fleet Hours <br />Total <br />Labor <br />Cost <br />Total <br />Equipment <br />Cost <br />Total Regrading <br />Cost <br />cy cy/hr hr $$$ <br />1 New Road 2,333 325C 398 6 $836 $1,078 $1,914 <br />2 Caribou 300 Level Access Road 0 $0 $0 $0 <br />3 Ore Storage Access Road 0 $0 $0 $0 <br />2,333 6 $836 $1,078 $1,914 <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. Page 5 of 7 Roads
The URL can be used to link to this page
Your browser does not support the video tag.