My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:24:26 AM
Creation date
12/17/2024 7:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Appendix L-1 2021 Reclamation Cost Calculation
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br />Waste Rock Dumps <br />Project Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Waste Rock Dumps - Cost Summary <br />Labor Equipment Materials Totals <br />Grading Costs $207 $305 N/A $512 <br />Cover Placement Cost $4,367 $12,985 N/A $17,352 <br />Topsoil Placement Cost $2,184 $6,492 N/A $8,676 <br />Ripping/Scarifying Cost $138 $204 N/A $342 <br />Subtotal Earthworks $6,896 $19,986 $0 $26,882 <br />Revegetation Cost $280 $100 $793 $1,173 <br />TOTALS $7,176 $20,086 $793 $28,055 <br />Waste Rock Dumps - Calculations <br />Regrading Volume Calculation Final Slope Area and Footprint Area Calculations <br />Regrading Push Distance Calculation Ripping/Scarifying Calculations <br />dozing distance:based on 2/3 final cut slope + 2/3 final fill slope (minimum = 50 ft)Minimum 1 hr ripping/scarifying time per dump <br />Slopes: <br />Number of passes = Final slope length ÷ Grader width <br />Travel distance = Number of passes x Mid-bench length <br />Total hours = (Travel distance ÷ Grader productivity) + (Number of passes x Grader maneuver time) <br />Minimum 1 hr <br />Flat Areas: <br />Flat area width = Final flat area ÷ Average long dimensions <br />Number of passes = Flat area width ÷ Grader width <br />Travel distance = Number of passes x Average long dimensions <br />Total hours = (Travel distance ÷ Grader productivity) + (Number of passes x Grader maneuver time) <br />Revegetation:Minimum 1 acre revegetation crew time per area <br />Figure 1 - Regrace Volume Calculation <br />Figure 3 - Final Slope Area and Footprint Area Calculation <br /> 21c 3 <br />2 c <br />Figure 2 - Dozing Distance Calculation <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. Page 3 of 6 Waste Rock Dumps <br />I <br />•'1 (Lif\Hc ght; <br />S .. U r «-l;Vi~ =•h~ -~='-----_J[_ <br />Dozirig distanc;a • _ <br />I I I I I <br />~o.r. le> I 11 ~·,~(I'>~•-: .,.,.,,.,,1 <br />------ <br />-------- <br />I 7 <br />--------.- <br />7
The URL can be used to link to this page
Your browser does not support the video tag.