My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (26)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:24:26 AM
Creation date
12/17/2024 7:48:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Appendix G-2 Water Treatment System
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M-1977-410 <br />Technical Revision 10 <br />April 26, 2022 <br />21 <br /> <br /> <br /> <br /> <br />Pond #1 Overtopping Management <br />As referenced in the caption for Figure 1, The primary purpose of the pipeline extension is to preclude <br />potential overtopping of Pond #1 via a pipeline conveying flows that would exceed the capacity of Pond <br />#1 into an existing Juliet ventilation raise. The Juliet Raise vertically intercepts the 2nd, 3rd, and 4th levels of <br />the Cross Mine. <br />The Juliet Raise is already serving as a water passageway to the lower levels of the Cross mine water from <br />the Apache/Potosi working area. A secondary benefit of the application would be an increase of solids <br />settling time contained in Caribou water. <br />The currently installed system comprises a 194 ft long 6” pipe conveying Pond #3C Caribou effluent into <br />Pond #1 behind the Cross Shop. The proposed extension would incorporate a 6” HDPE T-fitting at the end <br />of the existing pipe, where automated float valves would shutoff discharges into Pond #1 and divert the <br />flow into the Joliet Raise. The extension requires approximately 80 ft of 6” HDPE pipe. <br />GIR submitted to DRMS on April 14, 2022, a request for approval from DRMS pursuant with Mined Land <br />Reclamation Board Cease and Desist Order, for the installation of the pipeline which would extend the <br />pipeline that currently conveys water from Pond #3C to Pond #1 into the Cross Mine underground <br />workings known as the Juliet Raise. DRMS granted authorization on April 14, 2022 and requested that <br />details of the installation were presented in this Technical Revision. A schematic figure of the piping <br />change is shown below (Figure 3). <br /> <br />Figure 3 – Schematic Pipeline from Caribou Mins/Idaho Tunnel to Pond #1 and Cross Mine Juliet Raise
The URL can be used to link to this page
Your browser does not support the video tag.