Laserfiche WebLink
Cross Gold Mine <br />December 2024 G2-1 <br /> <br /> <br /> <br />1. Water Sampling <br />Groundwater and surface water sampling is covered in the attached water treatment and sampling plan <br />that was approved in Technical Revision 10. These approved sampling plans will be maintained for the <br />life of the operation. <br />Additionally, the approved stormwater management plan from TR 10 for the site is included for this <br />operation. Upon approval of this conversion the SWMP will be revised to reflect new stormwater control <br />measures. <br />2. Ore Monitoring Parameters <br />Ore will be sampled for the parameters listed below via SPLP and acid-base analyses. As the ore will <br />be kept within zero-discharge facilities, there are no applicable limits to compare the results to. The <br />data from ore sampling will be used to compare to groundwater samples downgradient to confirm <br />whether any ore material is somehow leaving the lined ore storage facility. <br />