Laserfiche WebLink
Cross Gold Mine <br />December 2024 U-15 <br /> <br /> <br /> <br />All water sampling will be conducted according to the procedures outlined in Appendix G-2. <br />12. Wildlife Protection <br />Most of the land in the permit area has been previously disturbed by historical activity. All potentially <br />hazardous chemicals will always be stored within appropriate structures, minimizing the risks to wildlife. <br />The installation of the new water handling facilities will eliminate a number of the ponds onsite and thus <br />protect wildlife from exposure to untreated mine water. <br />13. Disposal of Tailings in Mine Workings – Paste Backfill <br />Prior to the implementation of a mill facility at the Cross Gold Mine, the operator will submit a technical <br />revision to CDRMS demonstrating that the disposal of tailings in mine workings via paste backfill will <br />meet the requirements of Rule 3.1.7. <br /> <br />