My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:20:14 AM
Creation date
12/17/2024 7:47:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Table of Contents, Introduction Exhibit A Thru Exhibit U Appendix A Thru Appendix G
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cross Gold Mine <br />December 2024 L-1 <br /> <br /> <br />Exhibit L Reclamation Costs <br />Reclamation costs were estimated in the 2021 amendment using the Nevada Standardized <br />Reclamation Cost Estimator Version 1.4.1 (SRCE), Build 017b (available at: https://nvbond.org/. <br />(NDEP-BMRR 2019). This cost estimator is a robust and accepted by federal and state agencies in the <br />western U.S. A summary is provided in Table 7 below and the full set of spreadsheets (with quantities) <br />is available in Appendix L-1. The surface areas of buildings and other rectangular structures are <br />calculated using the nominal dimensions of the buildings. The surface areas of non-rectangular <br />features are determined in AutoCAD using the surface area command. The polylines that bind these <br />features are constructed using survey data. <br />Triangulation surface files were generated of the existing ground and all features that contain fill <br />material. The fill material surfaces include the berms built to construct Ponds 1, 2, 3A, 3B, and 3C; the <br />fill for the new road; and the waste rock and ore piles. The volume between the existing ground and the <br />final surface was then calculated in AutoCAD, with an inclusion perimeter polyline utilized to demarcate <br />the boundary of the feature. <br />1. 2021 Site Specific Assumptions <br />• Topsoil is trucked in from Nederland (4.3 miles = 22,704 ft distance at 6.6% grade). <br />• Pond sediment is trucked to landfill in Erie (44.3 miles = 233,872 ft at -2.2% grade). <br />• The foundation is assumed to be 6" for buildings and 0" for CONEX containers. <br />• The planting mix in Table 4 and 5 (Riparian or custom) as the planting mix because it is the <br />most expensive mix in the spreadsheet at $393/acre. <br />• Mulch and fertilizer are included in the revegetation cost estimate. <br />• There is a 60% erosion maintenance to the budget, which was approximated by determining <br />revegetated areas where the natural ground exceeds 3:1. <br />• There is a 50% revegetation maintenance allowance. <br />• The spreadsheet is designed for regrading, not complete removal of waste rock piles. Waste <br />rock volumes with haul distances (similar to the ponds) are used. <br />• Acres for reclamation are shown in Exhibit D, Table 1. <br />Table L- 1. 2021 Reclamation Cost Summary <br />Task Labor ($) Equipment ($) Materials ($) Total ($) <br />Earthwork/Recontouring 34465 76729 13267 124,011 <br />Revegetation/Stabilization 2760 987 9178 12,925 <br />Detoxification/Water <br />Treatment/Disposal of <br />Wastes <br />905 1695 0 2,600 <br />Structure, Equipment and <br />Facility Removal, and <br />Misc. <br />10099 4548 7980 22,627 <br />Monitoring 7104 20084 1306 28,494
The URL can be used to link to this page
Your browser does not support the video tag.