Laserfiche WebLink
Cross Gold Mine <br />December 2024 B-7 <br /> <br /> <br /> <br />From the point of beginning of the Cross-Caribou Portal Permit Area, thence S35d19’02”W a distance <br />of 750.7 feet to the point of beginning of Cross-Caribou Poral USFS Area 6; <br />THENCE (1) North 12°20'57" East, 54.39 feet; <br />THENCE (2) North 68°29'36" East, 77.52 feet; <br />THENCE (3) South 18°47'01" West, 129.54 feet; <br />THENCE (4) North 45°39'33" West, 58.79 feet; <br />Containing 5,185 square feet, more or less. <br /> <br />From the point of beginning of the Cross-Caribou Portal Permit Area, thence S27d41’53”W a distance <br />of 2066.8 feet to the point of beginning of Cross-Caribou Poral USFS Area 7; <br />THENCE (1) South 85°14'12" East, 278.20 feet; <br />THENCE (2) South 18°52'10" West, 20.35 feet; <br />THENCE (3) North 85°34'57" West, 278.68 feet; <br />THENCE (4) North 18°59'37" East, 22.09 feet; <br />Containing 5,724 square feet, more or less. <br />Total Permit and Affected Area = 8,959,627 square feet = 205.7 acres <br />The average elevation of the mine site is 9,700’ MSL. <br />Entry Coordinates: <br />Entrance: Access is from United States Forest Service (USFS) Road 505 at both the Operations Area <br />and the Comstock Area.