Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#059 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 500.00 0.00 3.00 3.00 2409 0.644 <br /> Haul Time: 0.644 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 500.00 0.00 3.00 3.00 3503 0.414 <br /> Return Time: 0.414 minutes <br /> Total Truck Cycle Time: 4.733 minutes <br /> Loading Tool unit <br /> Production 1,629.09 LCY/Hour Adjusted for job efficiency: 1,352.15 LCY/Hour <br /> Truck Unit Production <br /> 851.89 LCY/Hour Adjusted for job efficiency: 707.07 LCY/Hour <br /> Optimal No.of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 1,414.14 LCY/Hour <br /> Adjusted single truck/loader team production: 1,352.15 LCY/Hour <br /> Adjusted multiple truck/loader team production: 1,352.15 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 4.75 Hours <br /> Unit cost: $1.860 /LCY Total job cost: $11,947 <br /> CIRCES Cost Estimating Software <br />