My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-11_GENERAL DOCUMENTS - C2010089
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010089
>
2024-12-11_GENERAL DOCUMENTS - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 7:10:25 AM
Creation date
12/12/2024 7:07:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
General Documents
Doc Date
12/11/2024
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
MT3
Permit Index Doc Type
Findings
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task#059 Page 2 of 4 <br /> Payload Capacity: 95.24 LCY <br /> Truck Bed(volume)Basis: <br /> Struck Volume: 60.60 LCY <br /> Heaped Volume: 78.80 LCY <br /> Average Volume: 69.70 LCY <br /> Adjusted Volume: 78.80 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 67.20 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: NA <br /> Rated Capacity: 16.000 LCY(heaped) <br /> Bucket Fill Factor: 1.050 Moist loam or sandy clay(100%- 110%) 1.050 <br /> Adjusted Capacity: 16.800 LCY <br /> Job Condition Corrections: Site Altitude(ft.): 5000 feet <br /> Truck Loader Source <br /> Altitude Adj: 1.000 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.830 0.830 <br /> Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill 4 passes <br /> Excavators and Front Shovels: Truck <br /> Machine Cycle Time vs.Job Condition Rating: NA <br /> Selected Value within this Basic Rating: NA <br /> Track Loaders—Material Description: <br /> Cycle Time Elements(min.): <br /> Load: NA Maneuver: NA Dump: 0.100 <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump, 0.625 minutes <br /> maneuver): <br /> Cycle Time Factors Factor(min.) Source <br /> Material: Material 1/8"to 3/4"diameter-0.02 -0.020 (Cat HB) <br /> Stockpile: Conveyor or dozer piled 10 ft.high and up 0.000 (Cat HB) <br /> 0.00 <br /> Truck Ownership: Common ownership of trucks and loaders- -0.040 (Cat HB) <br /> 0.04 <br /> Operation: Constant operation-0.04 -0.040 (Cat HB) <br /> Dump Target: Nominal target 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: -0.100 minutes <br /> Adjusted Loader Cycle Time: 0.525 minutes <br /> Net Load Time per Truck: 1.675 minutes <br /> Truck Cycle Time: <br /> Truck Exchange Time: 0.80 Minutes Adjusted for site altitude: 0.800 Minutes <br /> Truck Load Time: 1.675 Minutes Adjusted for site altitude: 1.675 Minutes <br /> Truck Maneuver and Dump 1.20 Minutes Adjusted for site altitude: 1.200 Minutes <br /> Time: <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.