My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-11_BONDING - C2010089
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C2010089
>
2024-12-11_BONDING - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 7:10:25 AM
Creation date
12/12/2024 6:50:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Bonding
Doc Date
12/11/2024
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
MT3
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br /> Task description: Rip Facilities Area(Post SL-4 40%Remaining) <br /> Site: New Horizon North Mine Permit Action: MT3 Permit/Job#: C2010089 <br /> PROJECT IDENTIFICATION <br /> Task#: 010 State: Colorado Abbreviation: None <br /> Date: 12/3/2024 County: Montrose Filename: C089-010 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat DI IT- 11U Horsepower: 850 <br /> Ripper Attachment: 1-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $496.62 NA <br /> Operating Cost/Hour: $324.90 100 <br /> Ripper Ownership Cost/Hour: $27.44 NA <br /> Ripper Operating Cost/Hour: $16.65 100 <br /> Operator Cost/Hour: $38.59 NA <br /> Total Unit Cost/Hour: $904.20 <br /> Total Fleet Cost/Hour: $1,808.39 <br /> MATERIAL QUANTITIES Selected estimating method: Area <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 3.32 acres Rip Depth(ft): 3.00 Volume: 16,069 BCY or CCY <br /> Source of estimated quantity: Map 2.05.3(3)-3 <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: NA feet/second <br /> Area: <br /> Average Ripping Depth: 5.29 feet/pass <br /> Average Ripping Width: 7.94 feet/pass <br /> Average Ripping Length: 200.00 feet/pass <br /> Average Dozer Speed: 88.00 feet/minute <br /> Average Maneuver Time: 0.25 minutes/pass <br /> Production per unit area: 0.867 acres/hour <br /> Job Condition Correction Factors <br /> Unadjusted Hourly Unit Production: 0.867 Acres/hr <br /> Site Altitude: 5,000 feet <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Adjusted Hourly Unit Production: 0.72 Acres/hr <br /> Adjusted Hourly Fleet Production: 1.44 Acres/hr <br /> JOB TIME AND COST <br /> Fleet size: 2 Grader(s) Total job time: 2.31 Hours <br /> Unit cost: $1256.443 Per acre Total job cost: $4,171 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.