Laserfiche WebLink
Page 1 of 4 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Clean Sediment Ponds(Post SL-4 40%Remaining) <br /> Site: New Horizon North Mine Permit Action: MT3 Permit/Job#: C2010089 <br /> PROJECT IDENTIFICATION <br /> Task#: 105 State: Colorado Abbreviation: None <br /> Date: 12/6/2024 County: Montrose Filename: C089-105 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Generic 8-10 cy,6x4 <br /> -Loader: Cat 336D L 10'-6" Stick <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Excavator Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 NA NA NA NA <br /> Ownership cost/hour: $17.36 $244.29 NA NA NA NA <br /> Operating cost/hour: $48.17 $218.49 NA NA NA NA <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 NA NA NA NA <br /> Ripper op.cost/hour: NA $0.00 NA NA NA NA <br /> Operator cost/hour: $0.00 $33.87 NA NA NA NA <br /> Unit Subtotals: $65.53 $496.65 NA NA NA NA <br /> Number of Units: 3 1 0 0 0 0 <br /> Group Subtotals: Work: $693.24 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour: $693.24 <br /> MATERIAL QUANTITIES <br /> Initial volume: 6,000 CCY Swell factor: 1.000 <br /> Loose volume: 6,000 LCY <br /> Source of estimated volume: Division Estimate <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity <br /> Truck Payload(weight)Basis: <br /> Material weight: 2,700 Pounds/LCY <br /> Description: Earth-Wet excavated <br /> Rated Payload: 27,280 Pounds <br /> CIRCES Cost Estimating Software <br />