My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-11_BONDING - C2010089
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C2010089
>
2024-12-11_BONDING - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 7:10:25 AM
Creation date
12/12/2024 6:50:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Bonding
Doc Date
12/11/2024
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
MT3
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 4 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Replace Topsoil from Stockpile to Facilities Area <br /> Site: New Horizon North Mine Permit Action: MT3 Permit/Job#: C2010089 <br /> PROJECT IDENTIFICATION <br /> Task#: 059 State: Colorado Abbreviation: None <br /> Date: 12/6/2024 County: Montrose Filename: C089-059 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Cat 777F <br /> -Loader: CAT 992K <br /> Support Equipment-Load Area: Cat DI IT- 11U <br /> -Dump Area: NA <br /> Road Maintenance-Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker, 10,000 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 100 NA 35 35 <br /> Ownership cost/hour: $199.47 $270.75 $496.62 NA $129.81 $111.67 <br /> Operating cost/hour: $152.44 $230.31 $324.90 NA $31.20 $41.45 <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 $0.00 NA $0.00 $0.00 <br /> Ripper op.cost/hour: NA $0.00 $0.00 NA $0.00 $0.00 <br /> Operator cost/hour: $25.24 $36.85 $38.59 NA $27.76 $21.12 <br /> Unit Subtotals: $377.15 $537.91 $860.11 NA $188.77 $174.25 <br /> Number of Units: 2 1 1 0 1 1 <br /> Group Subtotals: Work: $1,292.21 Support: $860.11 Maint: $363.02 <br /> Total work team cost/hour: $2,515.34 <br /> MATERIAL QUANTITIES <br /> Initial volume: 5,760 CCY Swell factor: 1.115 <br /> Loose volume: 6,422 LCY <br /> Source of estimated volume: Map 2.05.2-1,Division Volume Estimates <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity <br /> Truck Payload(weight)Basis: <br /> Material weight: 2,100 Pounds/LCY <br /> Description: Earth-Loam <br /> Rated Payload: 200,000 Pounds <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.