Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#041 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Regrade Pond NHN-002(Post SL-4 40%Remaining) <br /> Site: New Horizon North Mine Permit Action: MT3 Permit/Job#: C2010089 <br /> PROJECT IDENTIFICATION <br /> Task#: 041 State: Colorado Abbreviation: None <br /> Date: 12/6/2024 County: Montrose Filename: C089-041 <br /> User: CCW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D9T-9SU <br /> Horsepower: 405 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $253.16 NA <br /> Operating Cost/Hour: $164.35 100 <br /> Ripper own. $18.79 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $2.37 25 <br /> Operator Cost/Hour: $38.59 NA <br /> Total unit Cost/Hour: $477.26 <br /> Total Fleet Cost/Hour: $477.26 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 8,389 <br /> Swell factor: 1.125 <br /> Loose volume: 9,438 LCY <br /> Source of estimated volume: Pond NIIN-002 Plan and Profile;Figure 3 <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 75 feet <br /> Unadjusted hourly 1,514.3 LCY/hr <br /> production: <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push 0% <br /> gradient: <br /> Average site altitude: 5,000 feet <br /> Material weight: 2,650 lbs/LCY <br /> Weight description: Decomposed rock-25%Rock,75%Earth <br /> Job Condition Correction Factor Source <br />